My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11627 AIRPORT RD AIRPORT RD BUSINESS PARK 2020-12-28
>
Address Records
>
AIRPORT RD
>
11627
>
AIRPORT RD BUSINESS PARK
>
11627 AIRPORT RD AIRPORT RD BUSINESS PARK 2020-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 2:46:33 PM
Creation date
8/27/2020 7:33:17 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11627
Tenant Name
AIRPORT RD BUSINESS PARK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.12 MATERIALS <br /> All materials shall be new and of the best quality of their respective kinds. The storage of <br /> materials shall be confined to the limits indicated by the Construction Manager. Materials and <br /> equipment shall be stored in a neat and orderly manner,taking all necessary precautions to <br /> prevent fire hazards and spontaneous combustion and to conform to the requirements of all <br /> applicable regulatory agencies and insurance policies.No materials or equipment shall be stored <br /> in locations that will hinder or limit the owner's accessibility to their parking, storage lockers, <br /> sidewalks or use of the property except as specifically authorized in writing by the Owner. <br /> Should the Contractor at any time introduce any materials that are not of the quality called for in <br /> these Specifications,he must immediately remove the same from the premises at his own <br /> expense,upon the instruction of the Construction Manager rejecting such materials. Neglect or <br /> refusal to do so empowers the Construction Manager to withhold such payment as may be due the <br /> Contractor until compliance with the orders. No used materials shall be utilized in the <br /> construction without the written permission of the Construction Manager. In all cases where an <br /> article is mentioned by the words "Approved Quality," "or Equal," "if approved," "Other <br /> approved," or similar terms,the Construction Manager will determine which is the best and most <br /> suitable article to use. The terms "as directed" and "selected" shall imply direction or selection in <br /> accordance with the instructions of the Construction Manager. <br /> 1.13 SUBSTITUTIONS <br /> Each bidder may submit,with their bid,a letter under separate cover listing substitutions of their <br /> choice which they are willing to guarantee. However,their bid shall be based on the specified <br /> items. This letter shall identify the product or products,the manufacturer of each,and shall state <br /> the amount to be added to or deducted from the Base Bid in the event the substitution is accepted. <br /> This separate proposal will not be used for the purpose of determining the successful bidder. <br /> Theseproposed substitutions do not require the prior approval of the Construction Manager. <br /> 1.14 WORKMANSHIP <br /> All work shall be performed by skilled mechanics. If, in the opinion of the Construction Manager <br /> any workman employed is incompetent,negligent, or unfit for the work assigned to him,he shall <br /> be discharged from the Work. All workmanship shall be strictly first class in every respect. <br /> Work hours are to be limited to 7:30 am to 5:30 pm Monday-Friday. No work is allowed on <br /> Saturday and Sunday. If work is desired during other times a request must be made to the owner. <br /> 1.15 DEFECTIVE WORK <br /> Work not conforming to the Drawings and Specifications,or to best trade practices shall be <br /> removed and replaced by the Contractor at his own expense as directed by the Construction <br /> Manager. <br /> 1.16 MEASUREMENTS <br /> All working measurements shall be taken from the buildings as provided by the contractor. <br /> 1.17 VARIATIONS <br /> Variations from the Drawings and Specifications may be made by the Construction Manager if <br /> desired, and shall in no way vitiate the Contract, except that a reasonable extension shall be made <br /> AIRPORT RD.BUSINESS PARK REROOF 01000-3 2-21-2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.