Laserfiche WebLink
• 0 <br /> 15. The east exterior wall indicates new windows. The following should be addressed: <br /> a. Structural details for the modifications to the exterior wall framing should be provided. <br /> b. The windows are required to have a minimum thermal performance per WSEC-15. The <br /> required rating should be specified. <br /> 16. The project includes new interior and exterior windows. The following should be addressed: <br /> a. The size and height of all windows should be specified. <br /> b. Safety glazing should be specified where required per IBC Section 2406.4. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> .... <br /> - Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: M/W/Th/F: 7:30am-12:O0pm & 1:00pm-3:00pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& online resources for updates to our service during the <br /> COVID-19 pandemic. We are currently experiencing a higher volume of calls and emails and have limited staff <br /> available to respond. Your patience is appreciated as we respond in the order received. <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 2 <br />