My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9105 10TH PL W 2020-08-28
>
Address Records
>
10TH PL W
>
9105
>
9105 10TH PL W 2020-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2020 11:18:53 AM
Creation date
8/28/2020 11:18:20 AM
Metadata
Fields
Template:
Address Document
Street Name
10TH PL W
Street Number
9105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/3/2020 City of Everett Page 1�% <br /> 151:15114M <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1809-009 Site Address 9105 10TH PL W <br /> Applied 9/28/2018 Applicant SHADYRYA TATYANA Lot <br /> Approved 12/26/2018 Owner HLAMAZDA PAVLOV Block <br /> Issued 12/28/2018 Contractor OWNER Tract <br /> Parent Permit No. PW 1811-054 Description BUILD ADDITION-2 STORY <br /> Notes (12/21/2018 11:10 AM TAH) <br /> ADDITION TO SFR ONLY,NO ADU APPROVED WITH THIS PERMIT. <br /> (11/29/2018 8:36 AM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 1/25/2019 1/25/2019 BLDG TMB APPROVAL Monolithic footing <br /> 02-FOOTING/SETB and wall+UFER <br /> 1/28/2019 1/28/2019 BLDG KMK APPROVAL <br /> 02-FOOTING/SETB <br /> 3/8/2019 3/8/2019 BLDG KMK CORRECTION eTRAKiT Inspection 3/7/2019 1:33 PM Pavlo Hlamazda <br /> 01-CONSULTATIO Request <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4252933664 <br /> e-Mail:alex2kpro@hotmail.com <br /> (3/8/2019 12:53 PM KMK) <br /> The distance of underfloor framing to <br /> ground.12"min to underside beams,18" <br /> min to underside of joists.Remove soil in <br /> underfloor to provide the required <br /> clearances. <br /> 3/14/2019 3/14/2019 BLDG KMK VIOLATION eTRAKiT Inspection 3/13/2019 4:37 PM Pavlo Hlamazda <br /> 05-UNDERFLOOR Request <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> (3/14/2019 1:37 PM KMK) <br /> Stop work: <br /> 1.work on the foundation and floor system <br /> is not bing conducted per approved design. <br /> 2.Obtain the services of a structural <br /> engineer to provide a revised design for <br /> submittal and review. <br /> 3/15/2019 3/15/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 3/14/2019 11:50 AM Pavlo Hlamazda <br /> 05-UNDERFLOOR Request We need inspection for 3/15/29 <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> (3/15/2019 10:26 AM DWF) <br /> Need to verify sthdl0 holdowns installed? <br /> Not long enough,too deep into concrete? <br /> Also check level for floor support,uneven <br /> concrete walls. <br /> Complete plate support for 2x6 walls. <br /> Open underfloor vent openings. <br /> Ok for floor sheeting.Will inspect <br /> corrections on shear nailing inspection <br /> INSP12 cWSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.