Laserfiche WebLink
2/3/2020 '— ..._._._ <br /> City of Everett r Page 2/ <br /> 1:51:15PM <br /> j <br /> INSPECTION ACTIVITY REPORT <br /> 3/29/2019 3/29/2019 BLDG KMK APPROVAL as noted 3/28/2019 1:03 PM Pavlo Hlamazda <br /> 07-EXTERIOR <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> (3/29/2019 1:01 PM KMK) <br /> Finish nailing off added straps <br /> 4/9/2019 4/9/2019 PLUMB SDP CORRECTION eTRAKiT Inspection 4/8/2019 2:48 PM Pavlo Hlamazda <br /> 02-GROUND Request <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> (4/9/2019 2:25 PM SDP) <br /> 1)Add a vent to the toilet in the laundry <br /> room <br /> 2)Move the 3"connection to the laundry <br /> room and upper floor downstream of the <br /> horizontal wet vent for the Master <br /> bathroom. <br /> 3)Rough in is ok after the above <br /> corrections have been made. <br /> 4/10/2019 4/10/2019 PLUMB DXW APPROVAL <br /> 03-ROUGH IN <br /> 4/10/2019 4/10/2019 PLUMB DXW APPROVAL eTRAKiT Inspection 4/9/2019 7:44 PM Pavlo Hlamazda <br /> 02-GROUND Request <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> 5/2/2019 5/2/2019 MECH 04-ROUGH DXW APPROVAL eTRAKiT Inspection 5/1/2019 6:25 PM Pavlo Hlamazda <br /> IN Request <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> (5/2/2019 2:02 PM DXW) <br /> condensate for HWT to be seperate from <br /> relief line. <br /> hard foam pad req.under HWT. <br /> HWT to be installed to MFG spec.and have <br /> installation book on site for HWT. <br /> 5/8/2019 5/8/2019 BLDG DWF CORRECTION eTRAKiT Inspection Insulation inspected,but need to have <br /> 11-INSULATION Request framing inspection connection completed <br /> and signed off before insulation can be <br /> signed off. <br /> 5/8/2019 5/8/2019 BLDG DWF CORRECTION Framing,need to have seismic straps install <br /> 08-FRAMING at post/beam for positive connection. <br /> Need plan reiview for scissor trusses <br /> installed,not on plans <br /> 5/9/2019 5/9/2019 BLDG DWF CORRECTION eTRAKiT Inspection Need to install R49 attic-scissor <br /> 11-INSULATION Request truss/rafters as per WSEC. <br /> 5/9/2019 5/9/2019 BLDG DWF APPROVAL eTRAKiT Inspection 5/8/2019 11:44 AM Pavlo Hlamazda <br /> 08-FRAMING Request <br /> Contact Name:Pavlo Hlamazda <br /> Site Address:9105 10TH PL W <br /> Phone:4253452123 <br /> e-Mail:Pavlohlamazda@gmail.com <br /> 5/10/2019 5/10/2019 BLDG DWF CORRECTION eTRAKiT Inspection 3rd inspection for insulation. <br /> 11-INSULATION Request Owner/contractor-needs to pay <br /> reinspection fee to continue inspections. <br /> Correction-Attic requires R49 insulation. <br /> INSP12 CAWS YS TE <br />