My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 8/28/2020
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Snohomish County 8/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:14 AM
Creation date
9/9/2020 10:19:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
8/28/2020
Council Approval Date
8/12/2020
End Date
12/16/2025
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
Diking District 6 Maintenance Agreement
Tracking Number
0002400
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sharing arrangement specified in Section 3A of this Agreement;b)reject or modify the <br /> proposed repairs; or c) in the event the Parties are unable to reach an agreement under a)or <br /> b)of this paragraph, either Party may undertake the necessary repairs at their own cost,but <br /> this will not otherwise impair or limit the rights, claims, or interests of either Party, <br /> individually or otherwise. <br /> The Parties agree that in the event of an unforeseen or catastrophic failure, each Party will <br /> make reasonable efforts to coordinate and work with the other Party to secure outside <br /> funding. <br /> 3. RESPONSIBILITIES <br /> A. Cost Sharing—Each Party to this agreement shall be responsible for their share of the <br /> costs related to the Tasks according to the following distribution schedule: <br /> Snohomish County 35% <br /> City of Everett 65% <br /> Costs necessary to perform Tasks described in Section 2 of this Agreement shall include,but <br /> are not limited to the following:purchase of materials, design, engineering,mitigation, <br /> maintenance, labor, and equipment costs, construction contract costs, and permitting costs <br /> necessary to accomplish this work. <br /> If approved by all Parties, the aforementioned cost sharing would also fund a third party <br /> administrator to assist with the management of Tasks enumerated under this Agreement. <br /> B. Specific Tasks <br /> 1. Snohomish County—In addition to sharing of costs as described in Section 3A,the <br /> County will be the project manager and lead party for submitting permit applications to <br /> appropriate regulatory agencies to accomplish the Tasks,unless both Parties agree otherwise. <br /> Permit requirements are expected to vary depending on the nature and location of the work <br /> and may be exempt due to maintenance exemptions. However,permits may include but are <br /> not limited to the following—Corps of Engineers (404 and/or Section 10), State of <br /> Washington(HPA and 401 certification), and Snohomish County(Shorelines,Land <br /> Disturbing Activity, Critical Areas compliance). It is understood that timing and terms of <br /> issuance of permits are controlled by the issuing agencies. <br /> The Tasks may be accomplished by County crews and/or City crews, or by construction <br /> contract administered by the City or by the County. If County or City crews are used to <br /> perform the Tasks,the management committee shall review and approve the tasks, estimated <br /> cost, and schedule for the projects. If outside contractors are used to perform the tasks, a <br /> competitive bidding process shall be used to select the contractors. <br /> 2015 DD6 Agreement Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.