Laserfiche WebLink
104 • <br /> June 2,1971' <br /> reorganizinhey dere di . <br /> feet •said the tete, <br /> cost for additionaltovarious floors,was 6665200431,435tforhe sthenbasement, <br /> $63,250x£ the thirds£ making <br /> total <br /> f$284,576, <br /> floor, <br /> which is an approximate average osquare <br /> said then you would have to add the cost of renovating the <br /> levator which is 629,000,and there was 627,424 in don- <br /> 6ingencleskconstruction63 <br /> 41,000. Hed then there were o <br /> t$40,920 c <br /> Sales Tax in he a amount 613,050 1 es - <br /> $399,970.Erl <br /> ung Hessler said that he had been look a <br /> the building Prom an engineering standpoint to see if it <br /> was sound and he said yes,it was tructurally sound. He <br /> said there was some work i electrical <br /> said,heating standpoint,but,building. He a1 y,ng,etc.,would have a leng <br /> life. The building had been e t <br /> elevator,pa,mr system, deetsh for <br /> re many <br /> some years and <br /> The <br /> - <br /> these inprovements would last for <br /> otter...gee SUCt as uta have a tern life such as approximatelyten <br /> years. <br /> Councilman <br /> ort before him and <br /> said that theca <br /> statement <br /> aeferred to the nodal been made about remodone whatsoever,eling this <br /> building that if no done to the basemen,no rooms,partitions,etc., <br /> tt$175,000 othing <br /> nal re x <br /> . it would still <br /> bring the building up to <br /> code. He asked Alr.Besslar if this were true. Mr.Hessler <br /> • replied,yes,it was true that 6175,000 was an estimated deSt <br /> £ 9 b h <br /> Iding kW to eede. Wet oecessarilY lust <br /> 1a did rs. Councilman Michelson <br /> t they <br /> ted for many <br /> do <br /> anything except absolutelynecessaryout what to <br /> keep <br /> the <br /> s..6� sd the <br /> st be from and <br /> ndtx Hessler said he felt 0175,070788!' <br /> 1 tI <br /> realistic24814020727106. <br /> oratt <br /> xd h would 1 i <br /> councilman remodeling the 9 at <br /> ak out irk <br /> arida h He <br /> the present time,and the problemsetn-he felt it <br /> s <br /> not the proper time to do this sort f mon, pedvh9 <br /> k{ h the time for <br /> the Cbuncil to ow <br /> the <br /> said hee that Council was <br /> to economixe• Hes <br /> aid <br /> the parol rloyee had <br /> one <br /> n fremodeling <br /> ! downward so he felt there was no h fewer employees they <br /> any <br /> .331' h City x <br /> and <br /> that the building adequatelyapublic <br /> certainly did not <br /> and+ e p it for many years tocome.• <br /> Mayor Anderson said,true,theyd done <br /> s deli <br /> ngin <br /> theeaP n light e <br /> ea'nttritl <br /> that didn'th problems bulkhead <br /> on this <br /> fthe being ollen so <br /> that o the nasenent and thorns out the <br /> centrix <br /> • <br /> Counci <br /> Rucker said that it was very apparent that some <br /> ncilmen <br /> proved this project and"some of the <br /> Count4cilrta opp'esadp it. He said he would have to include <br /> 46i114041,31d 4 <br />