Laserfiche WebLink
88 <br /> February 13,dna <br /> • President 0 e <br /> ted that no decision will b made today rat <br /> the scheduled Overstreet <br /> on this proposed ordinance. <br /> Councilman Gipson asked how routworking at the County <br /> and Mr.0erickson said he has hadfavorable6ieports. <br /> Councilman <br /> r <br /> angns asked if ether c used this system,and Dennis <br /> erickeonrepliedt severalothers <br /> record is e y geed and he h s heard n unfavorable• r <br /> ' use the <br /> criticism from developers,staff,elected offr citizens. <br /> Mayor Moore asked whether the Cycould a liability situation <br /> regarding the examiner's findings andc and ltr.0ericksonat <br /> replied he didn't.think it would and N and <br /> ' Council does not have to follow these recommendationsinmaking a decision. <br /> oilmana us asked about the role o the Planning Commission if the <br /> examiner held the hearings and Dennisickaon said it would <br /> •• sad, the <br /> Cand opportunity <br /> to <br /> such as <br /> her Program,zoning Code, <br /> • Mayor M, asked T representing t Snohomish County Master <br /> Builders,f i <br /> sviewpoint. Mr.Smelzer stated it very workable <br /> system and would eliminate a lot ofredtape. He felt there world be <br /> more consistency in the decisions also. <br /> The q o£c raised a said approximately <br /> ;� <br /> S30,000 sif a full-timeae amine re were hired. The,fees <br /> and probably increased.ta said t City of s <br /> fees da s ihan other surrounding cities are he C <br /> '� stated increased fees would handle he cost ofeanpart-time examanez. - <br /> alviday,representing the and 8 Corporation,stated <br /> hecha.{worked with all differentps wiN a hearing examiner <br /> there would be o consistency intheand this would <br /> me ezeasier <br /> for a developertowith as ntheyhc f anticipate N be <br /> decision <br /> would be made and an increase fees,i reasonable,would Dbeaaccepted. <br /> Councilman Langur asked Denniscould b down <br /> • if uthis system were used andrh replied mon time <br /> be saved. <br /> • <br /> t ate„a increase an fees would be allrightas <br /> moneyinibusiness. <br /> •'i Hei6h a$600 r application fee has e some <br /> of his and they <br /> idobjected to this and o <br /> hiring <br /> rykfull-time <br /> until the established. <br /> time <br /> also'! suggestedthe <br /> possibility ofsingNe County'sa <br /> E. • lable bas <br /> Councilman k" 'U 1 bene developers <br /> }F would She 'd the Planning <br /> Commission did not feel they were performing <br /> their <br /> due to thebacklog f k he membersrespendinggreat deal <br /> timed they were a vclunteer body. <br /> Councilman k the authority of the hearingexaminer <br /> and <br /> how the cystem would <br /> function. Dennis...son i Planning <br /> C0eP would information both erand <br /> e <br /> Planning ion; examiner would hhearings, efindings and nd <br /> # ddrecommendations O N 1 for decision. <br /> The g Commission would al he same. <br />}} 4 <br /> I <br />+ I' <br />