Laserfiche WebLink
March 16,1983 <br /> BIDS RECE/VED <br /> 100 <br /> 1 :1,1,:tZlowing bids were received for Everett's water separati.o.n.............r'' <br /> I Hos Bros.Construction,Inc. (Bid was withdrawn) 6 242,448.03 <br /> Lakevue Construction,Inc. 368,535.85 <br /> Land Construction Co. 472,174.78 <br />, Frank Coluccio Construction ComPanY 504,234.50 . <br />. SInce the low bidders,Hos Bros.Construction,have claimed error and <br /> wish to withdraw their bid,it is recommended that the bid be awarded <br />, to Lakevue Construction Co.for$368,535.85. <br /> 1 I' <br />' fl BID AWARD-WATER SYSTEM SEPARATION <br /> Moved by Councilman Langus,seconded by Councilman Aldcroft,*411 11144 <br /> contract for Water System Separation be awarded to the low bidder, <br />: Lakevue Construction,Inc.of Bellevue,Washington,based upon their <br /> proposal and unit bid of unit prices extended for the estimated totel <br /> r of$6368,535.85 as received at the bid opening held at 2:00 p.m., <br /> February 24,1983. <br /> p8100 00*2 <br /> 1 . Roll was called with all Councilmen voting yes. . <br /> .,, Notion Carried <br /> 1„,it), SEWER/UTILITY 6 TRANSIT/UTILITY BUILDINGS <br /> '''1)))1i,1 ' J08 Koolovski,Administration staff member,asked that Council award <br /> the bid for the Sewer/Utility Building to the lowest and most responsive <br /> I,'". bidder and accept Change Order 11 for the deletion of the Tranait/ <br /> o 11 UtilitY Building,which will be handl.at a later date. He said this <br /> , , . action was requested to bring the project within budget. <br /> President Pope said he was not comfortable with this process,and <br /> Councilman Stephenson said he understood there had been confusion among <br /> constractors on this jOb. <br /> 1 .''° tri.):'juiCs°atnete''''be:ot%"Ne'BUdgs:c'C'edmm'itZeCe°ToVr'elar'iew"'Ic:alo'enLaltcT.ng <br /> action. <br /> regular Council meeting. <br /> Roll was called with all Councilmen voting yes. <br /> '1 ').'' Mot)ion Carried <br /> . . <br />