My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984/10/17 Council Minutes
>
Council Minutes
>
1984/10/17 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 11:12:39 AM
Creation date
9/28/2020 11:30:55 PM
Metadata
Fields
Template:
Council Minutes
Date
10/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
405 <br /> • <br /> October 17,1984 <br /> • <br /> then [ The viaduct c t be repaired t <br /> loadingeVe and of remove them load current <br /> determined by astructu the <br /> engi eer awn <br /> $3said the,estimated oats to replace the •t r' e <br /> 00,000 for the Lombard bridge, 000,000 for he Oakeet badge end <br /> $1,000,000 for the gewitt viaduct. <br /> • <br /> He said the city has submitted proposal.t Aid applying <br /> r 808 matching MSS monies to replace the bridges. <br /> approval has been given by the a the Hewitt aTentative <br /> bridges,w the O ridge to bed e and wed at the State's Bridge <br /> H <br /> Committee Annual Fall Meeting. Agreement will not be formalized <br /> until [he city has clearw [ship of the bridges. sign <br /> consultants have been selected for the Hewitt <br /> Lombard bridgeS <br /> • <br /> but they a not able to begin work o thedesigns until the city <br /> has signed ageements with WSOOT State Aid. <br /> Urban Arterial Bare.funds ($18,000) have been r or <br /> uction.o Lombard bridge.. These funds e a esubject tt <br /> reconstruction <br /> beingunder-00-04c [act to build within 18 months of date of <br /> o <br /> the <br /> (v-10-84). <br /> He said <br /> thea has <br /> spoken t representatives n times <br /> over the phone,in the field and has u <br /> m t <br /> with them a heirehe Seattle <br /> office. Today the city [ raft agreementr f the three <br /> v <br /> bridges which will h t o he received <br /> by the attorney and staff. <br /> • N <br /> Na BMA <br /> participationint the remaining 208 replacement costa have <br /> been determined. <br /> Councilman Pp ( o <br /> asked i the repair w B <br /> na by the viaduct <br /> made it sound e enough t open the four lanes t ffie aad Mr.DaVie <br /> Said it WOUld not be structurally <br /> rally sound enough and would not comply <br /> with the weight limits underthe et laws. <br /> • <br /> Mr.Theal o Public Works said themayorhad authorlaed Mr. Davis <br /> and Bruce <br /> Jones meet with the railroad people to discuss the <br /> proposal of awere <br /> t going through town but they m areeable <br /> thin. The tte proposed th00 l Y allo the of constructing new <br /> e <br /> bridges but they said no,only the 8. Hesaid be.agreement sent <br /> by he railroad company needs negotiation as there a several <br /> erious.c dThis agreement would have t submitted <br /> $ <br /> o the a and o they approve,the city could proceed with the <br /> design on the bridges. <br /> Councilman Overstreet <br /> a asked what the city could do m the <br /> railraod people work faster and N.Theal„replie,actklly nothing <br /> could be done til the City Attorney rev he proposed <br /> agreement and the Mayo[bad returned. <br /> • <br /> President stephanson painted out <br /> t is obvious the council and the <br /> citizens v the o bridges t enn <br /> repaired and don't vent t wait two <br /> ais t sa <br /> asked t administration and legal <br /> departmentt look into any the[action <br /> that can be taken to speed <br /> up this process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.