Laserfiche WebLink
• <br /> • <br /> 4 January 8,1906 <br /> Moved by C so red b councilman ea that • <br /> second or Council a 8512-138ishereby declared <br /> • <br /> tthe he rill fora fvihel reading City <br /> Clerk <br /> ordis inances with call <br /> the <br /> inclusion of'10,5'n Section disposition3,line 10. <br /> AYES: Langus, Niva, Stephenson, Gipson. MOrrow, Pone, <br /> NAYS: None Ordinance No,1219-06 adopted. <br /> NORTH <br /> CORRIDOR ION POLICY <br /> COMMITTEE <br /> Bob Theisen, Everett Transit, <br /> introduced Caroline <br /> ine F <br /> eiss, Program <br /> oomis Countynsteicy who reviexe <br /> Managere North Corridor Extension project developed are a <br /> travel needs within Snohomish cot Snohomish County • <br /> and 0eaolaa kinds ofmass r wed including • <br /> traditional E single o double articulated bus a. light rail. • <br /> Sdifferent alignments were including routes co downtown • <br /> Everett via Paine Field and via <br /> F-5, <br /> Mayor EPAnderson, Chairman c the North Corridor <br /> extension <br /> Projectolicy Committee a Mayor of Mountlake T stated <br /> that <br /> the recommendation <br /> build a light rail a sig the <br /> right-of-way t downtown Everett fom du ncyline. <br /> segment from the eouth to the <br /> vicinity the A ood Malwouldd <br /> be implemented firstfollowed bythe extension to Everett Mall <br /> Business District. • <br /> Councilwas <br /> or the <br /> completion ofan tephenson[ asked what the time d whether could bei cof <br /> completed in time • <br /> to accommodate the anticipated grow.of the areal <br /> Jerry Diandorf, re of Snohomish bubregional c of Puget <br /> Sound Council <br /> o1ofanexplained <br /> that <br /> be <br /> in <br /> operation1o that would require alternate aof • <br /> financing. Ther with <br /> premise <br /> only <br /> existing <br /> sources Tfirst <br /> phase is expected • <br /> by the year 2000 with the extension to Everett possible by the year <br /> 2010.Mayor Moore ted c h e felt t a d^ <br /> o should not <br /> be endorsed i the plan does not include Everettin the initial <br /> phase. <br /> moved by Councilman M by <br /> endo <br /> the <br /> roft Corridor Extension Committee <br /> with• the inclusion that the lig rail line terminate n <br /> Everett. <br /> Mayor Anderson stated that recommendation basically <br /> stated that <br /> capacity <br /> in needed,that a fes Snohomish <br /> County nthat i needs so befinanced in thenreasonable <br /> way. <br />