My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987/08/26 Council Minutes
>
Council Minutes
>
1987/08/26 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 11:51:07 AM
Creation date
9/29/2020 7:52:07 AM
Metadata
Fields
Template:
Council Minutes
Date
8/26/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 y38 August 2g,1987 <br /> IT Nr. Dandles stated that all of the issues have been reviewed and <br /> 1I: Mr. <br /> been mitigated in the original conditions. The <br /> PlanningStaff <br /> M recommends that Council affirm the conditions ofapproval o f the <br /> a <br /> Se wa n <br /> Center Master plan and preliminary Binding Ste Plan placed <br /> IR bythe Planning Director through the exercise of substantive <br /> I3•, authority under SEPA. <br /> 619 .trill Bastian, Attorney for Donald Bocek and Sigma <br /> dv <br /> e Development, <br /> I' <br /> 602 Fisher Business Center,Lynnwood, a Sigma Development dOes <br /> + s <br /> PI object to the Seaway Center development <br /> but feels that the same <br /> conditions-9het are imposed on Seaway ter should be applicable to <br /> III <br /> the Kenilworth Hills project which v adjacent to the Seaway project. <br /> { Councilman Stephenson pointed out that the zoning was different an <br /> the e parcels and in the Southwest Everett Comprehensive Plan <br /> I process It w the intention that the differences in he property <br /> ��49v and the a intended use be very apparent t anyone. way <br /> 'i y �� property is coned N-1 andthe Kenilworth Hills property is zoned eA S. <br /> Donald Bocek of Sigma Development, Woodinville, stated the <br /> yr basis of the appeal inadequate f the buffsrequired and the access <br /> G detention facilities. a stated some f he detention pond <br /> j shown for the Seaway Property is on his property and he has never <br /> 11 A� 4� been contacted regarding he pond on his pr y ere ot <br /> T4 k It Nary Swift Dedrlc� 5101 23rd A N stat de tM1 eighbo[s m <br /> 3)14, againe[ the development but felt that more buffer zona should nit <br /> RC required. <br />•9a�II L.Freudenberg,4931 See Breeze Hay,stated the drainage problems <br /> III:Itin the area are such that no developmenta should be approved until <br /> the drainage issue is solved. He stated that retention system.and <br /> 1 W3 jl 9,„f. detention ponds do not work. <br /> I ii,'949r�¢`I 1 Sharon Koch stated she represents half of the property nets en <br /> I4 9 r R: 23rd and they feel that the buffer e a should be defined in detail <br />. y A tP�,i PPropertiesd ahould be wider between the Seaway Conte[ and the avenue, <br /> 4'gI:h Properties. <br /> i <br /> 0 Henke, President of HDNC to 2001 Sixth A ..., <br /> ��i reviewed the process followed develop Seaway Center. Tam <br /> Frbeck, Project Manager we <br /> ger revieproposed o osed projects which could <br /> the Sea y Cents site. also reviewed he marketing being <br /> done to attract desirable companies to the site who can contribute <br /> to the a and to the job market. <br /> �'9, . Randy Blair of Wilsey 6 Ham, Bellevue, who a the consulting <br /> 1 ”),I, engineers for the Seaway C reviewed the are <br /> step. <br /> �' taken to upFold the integ[lky of:se: <br /> frfdl:diebblytd <br /> Hve[e.tplan.�'' suedby Councilman 6CepM1aneon, Councilman Dangua toclose[M1epublic hear vn9.1P�ko ndnoone�I' [[eesiden[Gipsonaskedifanyon [ speak a <br /> � piled. <br /> �I Roll was called with all councilmen voting ye.. <br /> I.I. <br /> Il.�l <br /> IFIIb <br />
The URL can be used to link to this page
Your browser does not support the video tag.