Laserfiche WebLink
60 <br /> February 0,1909 <br /> The protests or objections which are made will be noted and <br /> detest ed end may be responded to by the city. If a written <br /> pxotesd M1as been Piled, ovoedtortunitoy will be given to tltlress the <br /> ncil. IP a written protest uat b t igen filed` now is ehe ards <br /> t,foe s A'mitten use be filed in den to be heard. <br /> andoee readingf the protests ow and calling for additional who ar working <br /> evidenced from property owners, four individuals who are working <br /> with city or at11 speak aboutthe Merrill on ideee Parkway. Eounci will <br /> entcinPo[metion and evidence to be considered by the council and <br /> those in attendance. <br /> Blair Burroughs, special counsel to the city in relation to LID <br /> matters,explained the various ways of paying for en LID. He said <br /> 1P the project was something that benefited the whale citysuch as <br /> a Library,It might be funded by eneral hobligaton bonds or taxes. <br /> If at w e project such as a sewer, x brings in revenue <br /> could be funded by rev a bonds. P it Ss an Improvementthat <br /> people educed to pay <br /> Isx it. That Ira/ a special benefit Locaa Inefitnto property,is about. Public Improvements will value, <br /> a benefit to pproperty <br /> owners is, increase its fair market slue, end since the nepeaare <br /> owners property nes been increased in valuer the property dx <br /> obliueted to pay LM1e pity Pax the [04 the lmprdvement ly. Tne <br /> of epeclal benefits bo strSetly a before end after teat, <br /> what w f LM1e property worth nhe re the toe is the and iM1be ie it <br /> xoxtM1 after the improvement. The dSPPerence is the special benefit. <br /> n.tones oP Public works saitl LIO]26 was formatl an uanua[y 3, <br /> Blvdto affect the Ave.and an t a nen arterial c Road to the <br /> an.Glenwood wet ,e.and a extension of Xaxdeswere ad o0 ncl n <br /> arterial. New w and drainage systems were also included <br /> In the scope o4 the project. <br /> To accomodate the accelerated development schedules o4 someo4 the <br /> property awn , the design end construction of the project was <br /> dlv3detl tote two Dhasea. <br /> Phase I of the project consisted of the construction of: <br /> 1. Merrill Creek Parkway,approximately 2200 linear feet <br /> from Seaway Blvd,t0 the north end east,an <br /> 2. Hardeson Road north from 75th St.SW approximately 600 <br /> linear feet. <br /> Phase II involves the construction of: <br /> 1. Merrill Creek Parkway,from the northern term.nlinear <br /> of <br /> Phase construction approximately 5,300 linear Peet to <br /> 01%e%dcPvenue,antl <br /> 2. northsan Road atel the northern terminus De eiase I <br /> north approximately 6,600 linear feet to Merrill Creek <br /> Parkway. <br /> In addition to the complete arterial street system, which includes <br /> curbs,gutters and sidewalks,the other improvements that have been <br /> installed as pert of Phase I,and that will be installed es part of <br /> Phase IIs are street lights, complete standard water and sewer <br /> sestems, nd en elaborate storm drainage s�stem. Included with a LM1e <br /> e lI storm tlreinage improvements is 10 a e foot tmenttion <br /> Dona, which w regof mitigating <br /> i g the the <br /> State Department he <br /> fill across <br /> as ping Ceek the environmental impacts of the <br /> 4111 across Nexxills and Rine Creek. <br />