Laserfiche WebLink
93 'ml :1 , ' <br /> March 7,1990 <br /> �I k <br /> BIO CALL <br /> Moved by Councilman Gipson, seconded by Councilman Moser to <br /> authorize call for bids fox thedemolition f structures on the <br /> site of to future..Service Center parking 1 t et 47.Fulton I�Avenue. `� <br /> Councilman Anderson asked about the 11 contamination. Brian (F �4,+I <br /> Jones, Public Works, stated that the soil contamination <br /> determinations are a pant of the bid specifications. fIr (I' <br /> IP r �i <br /> Roll was celled with all councilmen voting yea. { t <br /> Motion carried. 411 <br /> TRANSIT PASS AGREEMENTt F' !{y sI. <br /> Moved by Councilman Gipson, seconded by Councilman Morrow to II <br /> authorize the Manor to sign a regional monthly pass agreement 'I <br /> between Metro Transit{ Pierce Transit: Kitsap Transit; Community <br /> Transit; Everett Transit; Washington State Department of <br /> Transportation, Marine Division; and the City of Seattle to extend I I A �6 <br /> the original agreement dated October 1,1987 to December 31,1990. 11,1.1�`I <br /> Roll was celled With ell councilmen voting yes. <br /> ,1 111 <br /> Motion Carried. WI yl <br /> AGREEMENT II{Y II <br /> Moved by Councilman Morrow, seconded by Councilmen Overstreet to ', <br /> authorize the Mayor to sign a supplemental consulting agreement with �1�� <br /> James M. Montgomery, Inc. to provide inspection services t0 water �1'"a p Ii"I <br /> transmission line no.2. <br /> Roll was called with all councilmen voting yes. yy9 }tI Id: <br /> Motion carried. �I I l <br /> BSO REPORT li <br /> A hid opening w s held February 15,1990 for the construction f the �F 3 4 <br /> 1989 Mater Main Replacement project. Eight bids ore received with I1i':. <br /> the low bid being submitted by Wilder Construction Co., Inc. of {!� IIIr <br /> Everett,WA. The bids are as follows: IS r.,� <br /> Wilder Construction $557,375.05 <br /> Kar-Wel Construction 564,887.05 I i'IR <br /> �i <br /> Como Construct>on 593,596.39 <br /> Maxus Utility Specialist 633,409.62 <br /> Robison Construction 637,441.40 I� <br /> Deb <br /> tion <br /> 1 1 <br /> Pape and 762,471.83 ; lllI1',t <br /> Sheltlrup Construction 031,478.65 t <br /> l <br /> CitStaff recommedsfleplarweent project nbe hathe <br /> to elboei oConstruction Co, Inc.r in I Ill <br /> Everett,WA et a cost of x$557,375.05. <br />