Laserfiche WebLink
165 <br /> May 2,1990 <br /> The resultant cost of accepting these recommendations is: <br /> Basic Bid $5,783,000 <br /> Additive Alternates 1,5,6,7,8,9,10, <br /> 11,and 15 77,250 II 'i;11 I'll <br /> Deductive Alternate 12 43 000 <br /> Construction Bid $5,817:150 I'ftf.:,I 1 <br /> This construction bid Is within the architect's estimate of <br /> $6,152,000 and is within the budget. <br /> The base bids received were as follows: <br /> Cree Construction Company,Lynnwood $5,783,000 <br /> Engineers Contractors,Seattle 6,093,400 I 4il't ti t 11 <br /> Gilbert Moen Company,Yakima . 6,360,000 <br /> Strand Inc.,Kirkland I 6,739,000 <br /> Staff recommends City Council accept the base bid of Cree <br /> Construction Company of Lynnwood. <br /> BID AWARD IrIktlIC <br /> Moved by Councilman Moser, seconded by Councilman Overstreet that I ot XI,k I <br /> the contract for the Main Branch Library Remodel and Addition be I rt il 4.1 <br /> awarded to the low bidder, Cree Construction Company of Lynnwood, ,(.1•1 IN <br /> Washington based upon their proposal and unit bid of unit prices <br /> extended ftor the estimated total of$5,783,000 as received at the ,,,Ft 1,11 1 <br /> bid opening held at 2:00 p.m.,April 17,199C. ,SI.,t i',It'II— <br /> Roll was called with all Councilmen voting yes. <br /> ''41,III1 <br /> I II I t kt,t <br /> Motion carried. I, 'N'. <br /> CHANGE ORDER .. <br /> The water main construction portion of tne 7th Avenue S.E. j ,t I-71 tILI <br /> Improvements must precede the remainder of the construction contract I htiiII, th <br /> due to peak summertime demands on the water system. Three bids were <br /> received from qualified contractors, currently under contract with I: 0' h <br /> the City, to perform this work by change order to their existing <br /> contract: I.'It'I h <br /> I ttth' 0 <br /> Tri State Construction $116,062.87 <br /> Volker Stavin Pacific,Inc. 127,204.00 <br /> Wilder Construction 145,098.80 <br /> tlt I, II <br /> Moved by Councilman Gipson,seconded by Councilman Moser to approve <br /> Change Order 43 to Pipeline No. 2 - Obey Island, Tri State <br /> Construction,in the amount of 3116,062.87. t ttI' t il I <br /> Roll was called with all councilmen voting yes. <br /> ,P31 <br /> Motion carried. 1th: h <br />