165
<br /> May 2,1990
<br /> The resultant cost of accepting these recommendations is:
<br /> Basic Bid $5,783,000
<br /> Additive Alternates 1,5,6,7,8,9,10,
<br /> 11,and 15 77,250 II 'i;11 I'll
<br /> Deductive Alternate 12 43 000
<br /> Construction Bid $5,817:150 I'ftf.:,I 1
<br /> This construction bid Is within the architect's estimate of
<br /> $6,152,000 and is within the budget.
<br /> The base bids received were as follows:
<br /> Cree Construction Company,Lynnwood $5,783,000
<br /> Engineers Contractors,Seattle 6,093,400 I 4il't ti t 11
<br /> Gilbert Moen Company,Yakima . 6,360,000
<br /> Strand Inc.,Kirkland I 6,739,000
<br /> Staff recommends City Council accept the base bid of Cree
<br /> Construction Company of Lynnwood.
<br /> BID AWARD IrIktlIC
<br /> Moved by Councilman Moser, seconded by Councilman Overstreet that I ot XI,k I
<br /> the contract for the Main Branch Library Remodel and Addition be I rt il 4.1
<br /> awarded to the low bidder, Cree Construction Company of Lynnwood, ,(.1•1 IN
<br /> Washington based upon their proposal and unit bid of unit prices
<br /> extended ftor the estimated total of$5,783,000 as received at the ,,,Ft 1,11 1
<br /> bid opening held at 2:00 p.m.,April 17,199C. ,SI.,t i',It'II—
<br /> Roll was called with all Councilmen voting yes.
<br /> ''41,III1
<br /> I II I t kt,t
<br /> Motion carried. I, 'N'.
<br /> CHANGE ORDER ..
<br /> The water main construction portion of tne 7th Avenue S.E. j ,t I-71 tILI
<br /> Improvements must precede the remainder of the construction contract I htiiII, th
<br /> due to peak summertime demands on the water system. Three bids were
<br /> received from qualified contractors, currently under contract with I: 0' h
<br /> the City, to perform this work by change order to their existing
<br /> contract: I.'It'I h
<br /> I ttth' 0
<br /> Tri State Construction $116,062.87
<br /> Volker Stavin Pacific,Inc. 127,204.00
<br /> Wilder Construction 145,098.80
<br /> tlt I, II
<br /> Moved by Councilman Gipson,seconded by Councilman Moser to approve
<br /> Change Order 43 to Pipeline No. 2 - Obey Island, Tri State
<br /> Construction,in the amount of 3116,062.87. t ttI' t il I
<br /> Roll was called with all councilmen voting yes.
<br /> ,P31
<br /> Motion carried. 1th: h