My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990/05/02 Council Minutes
>
Council Minutes
>
1990/05/02 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:31:24 PM
Creation date
9/29/2020 8:38:39 AM
Metadata
Fields
Template:
Council Minutes
Date
5/2/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y d ; <br /> 64 <br /> May 2,1990 <br /> AGREEMENT <br /> Staff has reviewed and evaluated the proposals submitted for the <br /> is Landfill/Tire Fixe Remedial Investigation and Feasibility Studyeand <br /> yyyy,� recommended that the Department of Ecology approve <br /> 4 Inc. to perform the work. The Department of Ecology approved of <br /> staff's recommendation to select ERM to do this work. <br /> Moved by Councilman Gipson,seconded by Councilman Moser to approve <br /> the selection of ERM Northwest, Inc. as the consultant to perform <br /> I <br /> the work for the Landfill/Tire Fire Remedial Investigation and <br />{ Feasibility Study and authorize the Mayor to sign the consultant <br /> Yagreement. <br /> Roll was called with all councilmen voting yes. <br /> p Motion carried. <br /> BIDS RECEIVED <br /> The Main Library Remodel and Addition is the second and final <br /> project authorized r under the completed by the library Dyeman levy <br /> Architect h inlans and <br /> February <br /> specifications year <br /> a <br /> of this year antl bid call was s presents by the Council February 28, <br /> 1 3990. Four general contractors presented bids. <br /> �� After the bid opening the contractor <br /> indicated <br /> roofing the architect i <br /> tha <br /> he had made an err o u inhis <br /> the contrary he <br /> has stated has not requested <br /> hatt he will be <br /> honore his bid.ased m his bid, <br /> {)1 e <br /> ( The architect and the Library Board have reviewed the bid and e <br /> I,. recommending that the City accept the basic bid plus alternates 1, <br /> t rerecommended whiich l is eand <br /> deduct Acceptance seof cond tl elelevator e.12 is ng also the <br /> ' parkinglotend the plaza level.of Sincethe museum is unlikely to be <br /> built in the Civic Center,there is no need fore the second elevator. <br /> The architect is xeco mantling tet four ea her alternates not be <br /> acted upon at t4is timemfor the rolloxing x sans. <br /> Alternate 3 which installs copper onthe reading <br /> inoom to robid <br /> of <br /> eed to be clarified because there we s confusion <br /> as to what was actually specified. The intention is to have <br /> 11 I the architectswritetthe specifications and treat the <br /> copper roota change ge or <br /> Alternate 4 deletes the elevator stop at the proposed upper <br /> level of the museum. A change order will be written to allow <br /> 3 I only one elevator to go to the upper level. <br /> Alternates 13 and 14 costs came in above the architect's <br /> i <br /> estimate and they are recommending mending that the historic aluminum <br /> EE door grills (913) and the exterior ornamental lights not be <br /> accepted to allow them to explore other alternatives. <br /> 2 <br /> (I <br />
The URL can be used to link to this page
Your browser does not support the video tag.