My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990/11/07 Council Minutes
>
Council Minutes
>
1990/11/07 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 12:36:34 PM
Creation date
9/29/2020 8:47:48 AM
Metadata
Fields
Template:
Council Minutes
Date
11/7/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
445 <br /> November 7,1990 <br /> JOB COMPLETE-JETTY ISLAND DOCK <br /> Moved by Councilman Anderson, seconded by Councilman Gipson to <br /> accept the Jetty Island Dock Improvements project as complete and <br /> begin the 30-day retention period. <br /> Roll was called with all councilmen voting yes. <br /> Motion carried. <br /> AMENDMENT-SENIOR CENTER ROOF REPLACEtENT AGREEMENT <br /> rssOntg,Zda;PrWe'd-Il."0OS 0." em:Irwitt%7:0= : <br /> deductive change order and for application inspection of the roof <br /> during installation, a not to exceed amendment of $1,000 is <br /> necessary to retain metherhelt&Associates for these services which <br /> were not Included in the original contract. <br /> Moved by Councilman Gipson,seconded by Councilman Moser to aPPtOwe <br /> the expenditure of an additional 81,000 by amendment to the existing <br /> contract with Wetherholt & Associates for Senior Center Roof <br /> Replacement. <br /> Roll was called with all councilmen voting yes. <br /> Motion carried. <br /> CHANGE ORDER-SENIOR CENTER ROOF REPLACEMENT <br /> In order to bring the contract with Wester Contracting within the <br /> :71,t0i4n;t ' 34%th:hn.,lig=onhtSlc":UmWdat'5TOn <br /> thence total will be$15,100$63,400(not including 0.0.0.0.of$5,008.60)., <br /> Moved by Councilman Anderson, seconded by Councilman Overstreet to <br /> approve the deductive change order in the amount of 015,100 to the <br /> contract with Wester Contracting Inc. for the Senior Center Roof <br /> Replacement. <br /> Roll was called with all councilmen voting yes. <br /> Motion carried. <br /> BID REPORT-TRUCK SERVICE Icon <br /> D; bidnngr ' 0 :eV17:b:oor Sew held Sap teeter <br /> o. ThrOsrZeived weres0 .. <br /> Utility Equipment Inc. $11,511.51. <br /> Nelson Truck Equipment 12,886.30 <br /> Allied Body Works 13,072.53 <br /> *Does not meet specifications as detailed. <br /> 111111111111...- <br />
The URL can be used to link to this page
Your browser does not support the video tag.