Laserfiche WebLink
March 1,2000 <br /> • <br /> Glen Wells,architect.stated that multi use buildings are tough projects to <br /> develop.There will be 16,000 square fat of multi family use in this project. <br /> This proposed ordinance gives the developer more flexibility in making a mixed <br /> use project work. <br /> Canncilroember Warnock asked what the difference is between review processes <br /> 2 and 3. <br /> Dave Koenig answered that review process 3 requires a mandatory public <br /> hearing while with review process 2 there is notice of adjacent property with an <br /> optional public hearing. <br /> Coucihnember Warnock questioned if it will change this from a mandatory <br /> public hearing to an optional public hearing? <br /> Dave answered it will only change it th one use If a clinic is over 20,000 <br /> square feet and is a mixed-use building then it would he in review proems 2. <br /> The intent is to encourage mined um. <br /> Moved by Connnllmember Pope,seconded by CoundlmesoMr Grentreet to <br /> dose the public hearing. <br /> Roll was Called with all cou ncilmemberu voting yes except Counoilmember <br /> Anderson who was excused. <br /> Motion carried. <br /> 9a <br />