Laserfiche WebLink
May 17,MOO <br /> 60 day retention period prior to the release of the retainage in the amount <br /> of$11,862.55 to the general contractor,RLB Construction. <br /> Roll was called on the consent agenda items with all councilmembem voting <br /> Y.. <br /> Motion carried. <br /> LOAN APPLICATION-WATER TRANSMISSION PIPELINE <br /> REPLACEMENT <br /> Moved by Cousrilmember Simpson,seconded by Councilmember Warnock <br /> to authorize the Mayor to sign a 1001 Public Works Trust Fund loan <br /> application for the replacement of a section or the No.2 and No.3 water <br /> transmission pipelines in the amount or$1,599,425.00. <br /> The Public Works Department has used five previous Public Works Trust Fund <br /> (PWTF)loans to assist funding of transmission line replacement projects.The <br /> rent application is for replacement of Oammhsion lives No.2 and No.3. <br /> phase V.The project will occur at two different locations.immmdmuly east of <br /> the Snohomish River and immediately east of Ebey Slough. <br /> Roll was called with all oouncilmembers voting yes. <br /> Motion carried. <br /> LOAN APPLICATION-NORTH END SEWER REPLACEMENT <br /> Moved by Councilmember Warnock,seconded by Councilmember Simpson <br /> to authorise the Mayor to sign a 2001 Public Works Trust Fund ban <br /> application for the north end sewer replacement in the amount of <br /> 01,881,000.00. <br />