Laserfiche WebLink
July 26,2000 <br /> JOB COMPLETE-EVERGREEN WAY OVER SR 526 BRIDGE <br /> WIDENINGPROJECT <br /> Moved by Councihnember Warnock, seconded by Cauncllmesnber <br /> Overstreet to accept the Evergreen Way Over SR 526 Bridge Widening <br /> project as complete allowing the Mayor to sign a certificate of completionie <br /> which will begin the 60 day retention period p re <br /> retainage in the amount of 599,132.39 to the general connector,MB <br /> Constructors. <br /> Roll vas called with all ceuncilmemben voting yea except Counnlmemben <br /> Anderson and Gipson who were excused. <br /> Motion carried. <br /> COUNCIL BBL NO 0007-29 <br /> TIttER AND FINAL READING: <br /> AN ORDINANCE creating the special construction project entitled <br /> "Downtown Ponce Headquarters Remodel",}Amid 342,PPOpmn <br /> 002,authorizing the design and construction of alterations to the <br /> Police Headquarters. <br /> Moved by Councilmember Pope,seconded by Cououlmember Warnock that <br /> this is declared to be the third and final reading of Council Bill No.P002-29. <br /> Counciimember Pope stated that this item came before the Budget will Meme <br /> Committee and the Public Safety Committee. <br /> ThE City Clerk was directed to all the ran for the final disposition of the <br /> odiance. <br /> ...7.•-711 <br />