Laserfiche WebLink
• <br />• <br /> August 23,20110 <br /> Roll was called with all councNnembers vding yes. <br /> Motion carried. <br /> Councihnember Anderson left the Council Chambers. <br /> RFP .. a_EVEREa ATI.N/ac TR CTIaN t GAND <br /> SPECIAL INSPECTION SERVICES <br /> Requests for proposals for Everett Station and Everett Station Street <br /> Improvevwvm Conemrction Testing and Special Inspection Services were <br /> received July 24,2000 as follows: <br /> Rnaan&Associates 541,000.004 <br /> GEOTEST Services,Inc. 585,0005044 <br /> Materials Testing and Consulting $91,862.50 <br /> Mayes Testing Engineers $95,668.00 <br /> *Krum&Associate,Inc.has sent a lemur to the City requesting a withdrawal <br /> of its bid due to a calculation error. <br /> 44GEOTEST Services.lnc.'s lump sum bid price was incomplete. <br /> Moved by Couuciboember Pope,seconded by Counrilmember Overstreet to <br /> allow Brazen&Asseciatm,loc.to withdrew its bid;to reject the bid of <br /> GEOTEST Services,Inc.as vonaeaposdve;and N authorise the Mayor to <br /> sign an agreement for Ever.Station sod Everett Station Improvements <br /> Construction Testing and Special Inspection Se oles with the low.and <br /> most responsive bidder,Material Testing and Consulting,Burlington,WA, <br /> at their proposed price of$91,862.50. <br /> Coumilmmober Gipson questioned how the construction testing will tie in with <br /> the work being done by the general contra.,Wilder Comtmction. <br /> Paul Kahanski,Administration,stated that Exhibit A summarises the type of <br /> testing and special services that will be provided on site. The purpose is N <br />