Laserfiche WebLink
October26,2005 <br /> JOB COMPLETE—WATER MAIN REPLACEMENT <br /> To accept the Water Main Replacement"F"project as complete and <br /> authorize the Mayor to sign a certificate of completion which will <br /> begin the 60-day retention period prior to the release of retainage in <br /> the amount of$50,674.06 to the general contractor,Shoreline <br /> Construction. <br /> JOB COMPLETE—2005 HOT MIX ASPHALT OVERLAY <br /> To accept the 2005 Hot Mix Asphalt Overlay protect as complete and <br /> authorize the Mayor to sign a certificate of completion which will <br /> begin the 60.day retention period prior to the release of retainage In <br /> theamount of$1,279.95 and the retainage bond to the general <br /> contractor,Rinker Materials. <br /> Roll was called with all council members voting yes except Council <br /> MemberGipson who was excused. <br /> Motion.carried. <br /> COUNCIL BILL NO,051055 <br /> THIRD AND FINAL READING: <br /> AN ORDINANCE closing a special improvement project <br /> entitled"Everett Mall Way Improvements,"Fund 303,Program <br /> 063,as eetablished by Ordinance No.2667A2 <br /> Moved by Council Member Hatioe,seconded by Council Member Nielsen <br /> that this is declared to be the third and final reading of Council Bill No. <br /> 0510-55 and the City Clerk is directed to call the roll far the final <br /> disposition of the ordinance. <br /> 349 <br />