My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/19 Council Minutes
>
Council Minutes
>
2008/03/19 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:54:20 PM
Creation date
9/29/2020 4:46:56 PM
Metadata
Fields
Template:
Council Minutes
Date
3/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 19,2008 <br /> sufficiently material for the Council to reject the bid and should be <br /> waived as an informality or minor irregularity,having no effect on the <br /> competition between the bidders;end(2)that the unit prices in the <br /> bid proposal were for extra work which the City may order or not <br /> order at its discretion;and the unit prices stated In the bids were not <br /> a material factor In determining the low bidder. Accordingly, <br /> pursuant to Section 10.1 of the invitation to bid the Everett Municipal <br /> Code Section 3.46.060(B),the Everett City Council determines to <br /> deny the protest and to award the contract to the low bidder,Allied <br /> Construction,Inc.,for construction of the new Animal Shelter for an <br /> amount of 53,320,009.00. <br /> h <br /> i o <br /> to backout.Atto ney brrutes <br /> Jones explained the biddbondhegn if Alllprocessed irk.s <br /> Interim City Attorney Chris Knapp egad <br /> that he concurs with <br /> Bruce Jones and stated that the issueiswhether there s a bidAttorney with an <br /> irregularity which may be waived by the city council or was there a no bid. <br /> His opinion is that by having the numerical representation them is a bid. <br /> The council may decide whether to award with a minor irregularity. <br /> Council Member Roberts clarified that in his opinion there is a <br /> minor <br /> Irregularity. The purpose of the bid process is to provide for a prudent <br /> expenditure of public funds and a prudent expenditure of public funds is <br /> being taken with the motion. <br /> President Nielsen stated that both the attorneys for Powell and Allied have <br /> submitted helpful legal analysis. He concluded that this is <br /> irregularity.The amount of the bid has been supplied by the figures.minor The <br /> dew and the bid specifications are dear that the bid specifications am for <br /> the benefit of the owner,the City,and the City has the right to waive minor <br /> irregularities. There is no unfair advantage to Allied under these <br /> circumstances. <br /> Council Member Gipson stated that Allied notadied signature binds them <br /> to the bid.The irregularity is just that. <br /> 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.