My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/05/07 Council Minutes
>
Council Minutes
>
2008/05/07 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:55:12 PM
Creation date
9/29/2020 4:48:19 PM
Metadata
Fields
Template:
Council Minutes
Date
5/7/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 7,2008 <br /> any plan that goes to the voters for the Sound Transit do over induce light <br /> rail service to Everett. <br /> Pettl Barton,506 E View Ridge Drive,stated she has been before the city <br /> council in previous years regarding the quality of bus service to her <br /> neighborhood.Everett Transit has been responsive with a bus loop to her <br /> neighborhood and ridership has Increased.Removal of neighborhood bus <br /> service is currently being considered.This is not an acceptable solution. <br /> She stated that she and her husband own property cn Olympic Boulevard, <br /> one block north of the current bus route. She stated that they wish to <br /> offer to make a donation to the City of Everett of a portion of that property <br /> for use as a bus tum around so bus service can continue to Lower View <br /> Ridge.She thanked sty staff. <br /> President Nielsen stated that Tom Hingson,Transit Director,and Ryan <br /> Sass,City Engineer,will be In contact with them for further discussion. <br /> CONSENT ITEMS: <br /> Moved by Council Member Gipson,seconded by Council Member <br /> Affholter to approve the following consent items: <br /> RESOLUTION-CLAIMS <br /> To adopt Resolution No.6015 acknowledging the payment of audited <br /> and approved claims against the City of Everett in the amount of <br /> $1,744,982.57 for the period April 12,2008 through April 18,2008. <br /> JOB COMPLETE—SOUTH FND INTE,2CEPTOR NORTH <br /> SEGMENT SEWER PROTECTION <br /> To accept the South End Interceptor North Segment Sewer <br /> Protection Project as complete and authorize the Mayor to sign the <br /> Certificate of Completion with KLB Construction allowing the release <br /> of the retainage In the amount 01543,882.25. <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.