My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc. 9/28/2020 Change Order 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
Premier Field Development Inc. 9/28/2020 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 9:22:43 AM
Creation date
9/30/2020 9:22:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc.
Approval Date
9/28/2020
Council Approval Date
5/15/2019
End Date
9/12/2020
Department
Parks
Department Project Manager
Dean Shaghnessy
Subject / Project Title
Phil Johnson Ballfields Renovation
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001860
Total Compensation
$61,356.75
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 6/25/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Cover Sheet/For Internal City Use Only <br /> 8 $ 3,101,64 Irrigation pipe sleeves for landscaping in the new parking lot- <br /> Landscape design was not complete at the time project was <br /> bid. PVC pipe sleeves where installed under the asphalt parking <br /> lot to reach landscape islands with irrigation. <br /> 9 $ 1,538.10 Demolition and disposal of concrete bridge girder located <br /> during access road grading-A large concrete bridge girder was <br /> buried in the fill and was discovered while grading for the new <br /> access road. The girder had to be cut up into manageable <br /> lengths and disposed of offsite. <br /> 10 $ - No cost delay due to Covid 19. <br /> $ 61,356.75 Total Amount <br /> City Staff Contact: <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.