Laserfiche WebLink
GENERAL PLUMBING NOTES LEGEND ABBREVIATIONS <br /> GENERAL: - • • • - COLD WATER PIPING ACM AREA CONSTRUCTION MANAGER <br /> 1. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH 2O14 ILLINOIS DOMESTIC SUPPLY SYSTEMS: <br /> PLUMBING CODE, ALL LOCAL CODES, AND ACCEPTABLE TO THE AUTHORITY 1. THE INCOMING WATER SERVICE PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. <br /> HAVING JURISDICTION, FROM THE EXITING SANITARY PIPE. WHERE A 5 FT. SEPARATION IS NOT ------------- TEMPERED WATER PIPING (110'F) AV� ATMOSPHERIC VpCUUM BREAKER <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM <br /> 2. ALL INSTANCES OF CONFLICT BETWEEN DRAWINGS AND PLUMBING CODE, 2014 OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. <br /> ILLINOIS PLUMBING CODE SHALL SUPERCEDE DRAWINGS. HOT WATER PIPING 140'F BSI BEVERAGE SYSTEM INSTALLER <br /> 2. ALL UNDERGROUND SITE PLUMBING SHALL CONFORM TO NSF 61, SHALL BE ' ° � � � ) z <br /> 3. ALL PLUMBING WORK SHA�L BE PERFORMED BY A LICENSED PLUMBER. TYPE K COPPER TUBING OR COPPER PIPE, POLYETHYLENE (PE) OR CPVC. a <br /> IF CPVC IS USED, FOAM INSULATION SHALL BE INSTALLED AT ALL CHANGES � � � � � � <br /> 4. ALL DIMENSIONS, CLEARANCES AND TOLERANCES SHALL BE VERIFIED PRIOR OF DIRECTION TO ACCOUNT FOR EXPANSION AND CONTRACTION. - � � - • � • - RECIRCULATED HOT WATER PIPING CO CLEAN-OUT z w <br /> TO INSTALLATION. ALL ROUGH-IN LOCATIONS SHALL BE COORDINATED WITH <br /> 0 0 <br /> THE MANUFACTURER'S SUBMITTAL INFORMATION. 3. INCOMING WATER SERVICE PRESSURE SHOULD BE BETWEEN 45 AND 55 PSI v_� <br /> STATIC. WHERE WATER PRESSURE SERVICE EXCEEDS 80 PSI STATIC, AN -- --- ---- ---- ---- ---- - OVERHEAD LINES (BY P.C.) DC DOWNSPOUT COVER W <br /> 5. ALL DIMENSIONAL INFORMATION IS AS FOLLOWS (UNLESS NOTED OTHERWISE): APPROVED WATER-PRESSURE REDUCING VALVE WITH STRAINER CONFORMING °C <br /> A. UNDERGROUND PIPE IS TO FOUNDATION TO ASSE 1003 SHALL BE INSTALLED. WHERE INCOMING WATER PRESSURE IS <br /> B. OVERHEAD PIPE IS TO FINISHED WALL BELOW 45 PSI STATIC, A PRESSURE BOOSTER SYSTEM SHALL BE INSTALLED. --SAN-- UNDERGROUND SANITARY PIPING DFU DRAINAGE FIXTURE UNIT(S) <br /> C. ELEVATIONS ARE TO FINISHED FLOOR <br /> 4. IF THE RESTAURANT HAS A COMBINED WATER AND FIRE SPRINKLER SERVICE, <br /> 5. ALL MATERIALS, FIXTURES AND EQUIPMENT USED SHALL BE IN ACCORDANCE THE INCOMING WATER SERVICE SHALL BE SIZED BASED ON THE FIRE <br /> WITH MCDONALD'S SPECIFICATIONS. SPECIFICATIONS ARE CONTAINED WITHIN SPRINKLER CONTRACTOR'S ITYDRAULIC CALCULATIONS. --Gw -- UNDERGROUND GREASE WASTE PIPING EC ELECTRICAL CONTRACTOR <br /> THESE DRAWINGS AND THE MCDONALD'S PROJECT MANUAL. ANY CONTRACTOR <br /> IN NEED OF A COPY OF THE MCDONALD'S PROJECT MANUAL SHALL CONTACT 5. PROVIDE A MINIMUM Y2" ANNULAR CLEARANCE AROUND ALL PIPE SLAB VENT PIPING FAC FIRE ALARM CONTRACTOR <br /> ------------- <br /> PENETRATIONS. <br /> THE MCDONALD'S AREA CONSTRUCTION MANAGER. ANY VARIANCE FROM THE � <br /> MCDONALD'S SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE o � � � � � <br /> ENGINEER-OF-RECORD. 6. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE � ABOVE GROUND STORM PIPING FCO FLOOR CLEAN-OUT <br /> INSTALLED AT THE INCOMING SERVICE WHERE REQUIRED BY CODE. <br /> 6. SEE COORDINATION SCHEDULE FOR ADDITIONAL SCOPE OF WORK. z � � � � � <br /> 7. AN EXPANSION TANK SHALL BE INSTALLED ON THE COLD WATER LINE INLET <br /> 7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ITS LISTING TO THE WATER HEATER. SEE EXPANSION TANK SCHEDULE. -- ST -- UNDERGROUND STORM PIPING FD FLOOR DRAIN <br /> SEAL <br /> AND/OR THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. g, ALL WATER SUPPLY PIPE WITHIN 5 �i'. OF THE BUILDING AND INSIDE THE <br /> 8. WHERE POOR SOIL CONDITIONS EXIST OR WHERE SUBSTANTIAL SETTLEMENT BUILDING SHALL COMP�Y WITH NSF 61 AND SHALL BE TYPE L COPPER �' HOSE BIBB FPC FIRE PROTECTION CONTRACTOR ,��, G. �^�� <br /> OF EITHER THE PIPING, THE BUILDING OR ADJACENT WALKS, PLANTERS, ETC., TUBING, COPPER PIPE OR CPVC PIPE. g"�' u� �A��� <br /> MAY OCCUR, THE CONTRACTOR SHALL PROVIDE ADEQUATE UNDERSLAB � � �4 �����' <br /> STAINLESS STEEL PIPE HANGERS OR APPROVED OTHER SUPPORT. 9• CPVC PIPE SHALL BE FLOWGUARD GOLD OR FLOWGUARD BENDABLE AS 1\I CHECK VALVE FS FLOOR SINK �v�� °� <br /> MANUFACTURED BY LUBRIZOL. <br /> 9. ALL PIPE SLEEVES SHALL BE PROPERLY SEALED AND INSULATED TO PREVENT *o � <br /> HEAT LOSS AND SEEPAGE. 10. CPVC PIPE SHALL BE CONNECTED WITH FLOWGUARD GOLD YELLOW LOW-VOC � BALL VALVE GC GENERAL CONTRACTOR �SA� 37�gp ��W <br /> SOLVENT CEMENT AS MANUFACTURED BY IPS WELD-ON OR OATEY. .,p ?� wo <br /> 10. ALL PIPE INSULATION SHALL BE PROTECTED FROM DAMAGE FROM PIPE ����R � <br /> P T TION SHALL BE LIGHT GAUGE GALVANIZED STEEL OR � 1. ALL CPVC PIPE SHALL BE INSULATED TO PREVENT EXPOSURE TO GREASE. I�b THERMOSTATIC MIXING VALVE GI GREASE INTERCEPTOR ��s�������� <br /> HANGERS. RO EC <br /> EQUAL. 12. ALL SUSPENDED PIPE SHALL BE SUPPORTED AS FOLLOWS: Ex�� �S /0 �" <br /> 11. ALL PENETRATIONS OF FIRE-RATED WALLS SHALL BE FIRESTOPPED WITH AN MATERIAL MAX. HORIZ. SPACING MAX. VERT. SPACING � FLOOR DRAIN GPF GALLONS PER FLUSH 4jrd � <br /> APPROVED AND LISTED FIRESTOPPING SYSTEM. COPPER PIPE 12 F�i". 10 FT. <br /> SANITARY AND VENT SYSTEMS: COPPER TUBING <1Y4" 6 FT. 10 FT. <br /> 1. THE BUILDING SANITARY PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. FROM COPPER TUBING >1Y2" 10 FT. 10 FT. � CLEAN-OUT (FLOOR OR YARD) GPM GALLONS PER MINUTE �� o ` N <br /> THE INCOMING WATER SERVICE. WHERE A 5 FT. SEPARATION IS NOT CPVC <1" 3 FT. 10 FT. z o�- � � N <br /> � <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM CPVC >1Y4" 4 FT. 10 F�T. FLOOR SINK GW GREASE WASTE � r°'n n.�L �'w� �� <br /> FT <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. a � � o � �, � <br /> 13. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE � L � `� _ � <br /> 2. ALL SANITARY AND VENT PIPE SHALL BE PVC TYPE DWV, ABS OR CAST-IRON INSTALLED AT THE INLET TO THE WATER FILTRATION SYSTEM. ALL PIPING " ,� 3= � � 3 N � �: <br /> DOWNSTREAM OF THE RPZ SHALL BE COPPER OR CROSS-LINKED rr� PRESSURE GUAGE HS HAND SINK W .�-�•� � _ � „3 � � <br /> WHERE REQUIRED BY CODE. -- o_ <br /> POLYETHYLENE (PEX). v >.a�i °'N -�o C `o_ <br /> 3. ALL HORIZONTAL SANITARY PIPE SHALL BE INSTALLED WITH A MINIMUM PITCH � T � � <br /> � E Z- � � o <br /> 14. ALL DEVICES, APPLIANCES, AND APPARATUS INTENDED TO SERVE SOME " ° � a��° °' �a <br /> AS FOLLOWS: SPECIAL FUNCTION SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW ��� LOW PRESSURE SWITCH I.P.S. IRON PIPE SIZE (ALSO NPS) � o >,� �-• � X <br /> _v� w v �v� � w <br /> PIPE SIZE MIN. SLOPE AND CONTAMINATION OF THE WATER SUPPLY SYSTEM. ALL BACKFLOW <br /> ' 2X�" OR LESS Ya" PER FT. PREVENTION DEVICES SHALL BE ASSE LISTED AND APPROVED FOR THE DEVICE � � o „ � <br /> 3" TO 6" Ys" PER FT. OR APPLIANCE THEY SERVE. � HIGH PRESSURE SWITCH KEI KITCHEN EQUIPMENT INSTALLER a � <br /> '' � � 3 <br /> N N � o � � <br /> 8" OR LARGER Y�s" PER FT. �5. ALL WATER SUPPLY LINES SHALL BE PROVIDED WITH A QUARTER-TURN ��i � p ��� 3 � _ <br /> 4. CLEANOUTS SHALL BE IN S T A L L E D I N A L L H O R I Z O N T A L D R A I N A G E P I P E A N D S H U T-OF F VA LV E BEFORE FINAL CONNECTION TO E QUIPMENT. ��V SOLENOID VALVE KES KITCHEN EQUIPMENT SUPPLIER 3 d 3 <br /> SHALL BE LOCATED NOT MORE THAN 100 FT. APART. 3 G U <br /> � � � � � W W <br /> 16. QUARTER-TURN SHUT-OFF VALVES SHALL BE INSTALLED UPSTREAM OF ANY - O �a � ° W W <br /> INLINE BACKFLOW PREVENTION DEVICE. ~ " THREE-WAY VALVE LAV LAVATORY � '� �� a o �`W <br /> 5. C L E A N O U T S S H A L L B E I N S T A L L E D A T A L L C H A N G E S O F D I R E C T I O N G R E A T E R '� � x <br /> Z .c c � u <br /> THAN 45 DEGREES. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS C7 °-°o = �e W <br /> 17. ALL VALVES AND BACKF�OW PREVENTION DEVICES SHALL BE INSTALLED WITH :__- cn <br /> IN A SINGLE PIPE RUN, ONLY ONE (1) CLEANOUT SHALL BE REQUIRED FOR FITTINGS THAT FACILITATE REMOVAL IN CASE OF FAILURE. � � � W <br /> EVERY 40 FEET OF DEVELOPED LENGTH. C=C..}� PRESSURE REGULATOR MC MECHANICAL CONTRACTOR � � M � z <br /> 6. CLEANOUTS SHALL BE INSTALLED ON PIPES PRIOR TO ANY SLAB 18. ALL OVERHEAD WATER LINES SHALL BE INSUtATED WITH 1" THICK EXTERNAL <br /> PENETRATION. JACKETED INSULATION AND A MINIMUM INSTALLED R-VALUE OF 3.7. '�\,! DUAL CHECK VALVE OR RPZ MHT MALE HOSE THREADS <br /> 7. WHERE PIPING IS LOCATED WITHIN WALL CAVITIES, ACCESS TO THE CLEANOUTS 19. PRIOR TO BUILDING TURNOVER, THE DOMESTIC WATER SUPPLY SYSTEM SHALL `� <br /> BE PURGED OF DELETERIOUS MATERIAL AND DISINFECTEDo DISINFECTION '` DUAL CHECK VALVE WITH ATMOSPHERIC � <br /> SHALL BE PROVIDED. �"`( MS MOP SINK <br /> SHALL BE DONE IN ACCORDANCE WITH THE LOCAL HEALTH CODE, PLUMBING VENT o0 <br /> 8. CLEANOUTS ON 6-IN. AND SMALLER PIPES SHALL BE PROVIDED WITH A CODE OR IN ACCORDANCE WITH AWWA C651 OR AWWA C652. � <br /> CLEARANCE OF NOT LESS THAN 18 IN. CLEANOUTS ON 8-IN. AND LARGER STRAINER NPS NATIONAL PIPE THREAD STANDARD j <br /> PIPE SHALL BE PROVIDED WITH A CLEARANCE OF NOT LESS THAN 36 IN. ~ <br /> > <br /> 9. ALL SUSPENDED SANITARY AND VENT PIPE SHALL BE SUPPORTED AS � <br /> FOLLOWS: <br /> �' RELIEF VENT NPT NATIONAL PIPE THREAD TAPERED � <br /> i�,;: <br /> w <br /> MAX. HORIZ. MAX. VERT. � <br /> MATERIAL SPACING SPACING <br /> 0/0 OWNER/OPERATOR � <br /> ABS 4 FT. 10 FT. <br /> . PVC (TYPE DWV) 4 FT. 10 FTa <br /> CAST-IRON (<10 FT. PIPE SECTIONS) 5 FT. 15 FT. OH OVERHEAD zo <br /> CAST-IRON (10 FT. PIPE SECTIONS) 10 FT. 15 FT. � <br /> a <br /> 10. ALL PLUMBING FIXTURES SHALL BE VENTED AND THE MAXIMUM DISTANCE P PUMP o <br /> FROM THE FIXTURE TRAP TO THE VENT SHALL BE AS FOLLOWS: <br /> LL <br /> TRAP SIZE SLOPE DISTANCE Z <br /> 1y4" Y4" PER FT. 2'-6" PC PLUMBING CONTRACTOR G <br /> 11�" y4" PER FT. 3'-6" � <br /> 2" y4�� PER FT. 5'-p,� a <br /> 3" �" PER FT. 6'-0" RC REFRIGERATION CONTRACTOR <br /> 4" & LARGER Ya" PER FT. 10'-0" <br /> 11. ALL PLUMBING VENTS THROUGH THE ROOF SHALL TERMINATE A MINIMUM OF RPZ REDUCED PRESSURE PRINCIPLE <br /> � 12 INCHES ABOVE THE ROOF AND SHALL BE LOCATED A MINIMUM OF 8 FT. BACKFLOW PREVENTER <br /> FROM ANY PARAPET WALL. WHERE A VENT TERMINATES WITHIN 8 FT. OF A <br /> PARAPET WALL, THE VENT SHALL TERMINATE A MINIMUM OF 6 INCHES ABOVE SS SANITARY SEWER � Q <br /> THE PARAPET. <br /> 12. ALL PLUMBING VENTS SHALL TERMINATE A MINIMUM OF 10 FT. HORIZONTALLY O N � <br /> FROM ANY OUTDOOR AIR INTAKE. WHERE A PLUMBING VENT IS LOCATED ST STORM SEWER Z � m <br /> WITHIN 10 FT. OF AN INTAKE, THE VENT SHALL TERMINATE A MINIMUM OF 2 � � <br /> FT. ABOVE THE INTAKE. SVB ANTI-SIPHON, SPILL RESISTANT W p U <br /> VACUUM BREAKER Z � O <br /> 13. ALL SIDE WALL VENT TERMINATIONS SHALL BE PROTECTED TO PREVENT BIRDS v <br /> OR RODENTS FROM ENTERING OR BLOCKING THE VENT OPENING. � � � <br /> TAB TEST AND BALANACE CONTRACTOR <br /> 14. ALL FLOOR DRAINS THAT DO NOT SERVE EQUIPMENT SHALL BE PROTECTED <br /> � � AGAINST DRYING OUT EITHER THROUGH THE INSTALLATION OF A TRAP PRIMER, rn � � � <br /> � DEEP SEAL TRAP OR PROSET TRAP GUARD. UG UNDERGROUND <br /> o � <br /> � � w <br /> a- 15. ALL APPLIANCES SHALL DRAIN TO AN APPROVED SANITARY WASTE RECEPTOR � � � m <br /> c��, (FLOOR SINK OR FLOOR DRAIN WITH FUNNEL). 1NDIRECT DRAINAGE FROM AN UR URINAL � o o Z � <br /> � APPLIANCE SHALL MAINTAIN AN AIR GAP BETWEEN THE PIPE OUTLET AND THE <br /> v TOP OF THE RECEPTOR. THE MINIMUM DISTANCE BETWEEN THE PIPE OUTLET Z � � <br /> � AND THE TOP OF THE RECEPTOR SHALL BE TWICE THE DIAMETER OF THE <br /> V VENT Q � O� <br /> N APPLIANCE DRAIN PIPE. � o o � N O <br /> � WC WATER CLOSET N � � m o o � <br /> o w � z i3 Q <br /> � z <br /> a WCO WALL CLEAN-OUT � ~ a <br /> � Q � � <br /> d� � o o � <br /> � 3 <br /> � - <br /> � SHEET NUMBER <br /> J WSFU WATER SUPPLY FIXTURE UNIT(S) <br /> a <br /> rn <br /> oYC YARD CLEAN-OUT " ' • O <br /> � P <br /> � <br /> 0 <br /> 0 <br /> � <br /> _ <br />