My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4020 COLBY AVE 2020 Plans 2022-11-08
>
Address Records
>
COLBY AVE
>
4020
>
Plans
>
4020 COLBY AVE 2020 Plans 2022-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 4:05:45 PM
Creation date
10/15/2020 3:28:11 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4020
Permit
B2002-027
Year
2020
Notes
INTERIOR TI NEW FLOORS FINISHES DECOR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLUMBING NOTES LEGEND ABBREVIATIONS <br /> GENERAL: - • • • - COLD WATER PIPING ACM AREA CONSTRUCTION MANAGER <br /> 1. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH 2O14 ILLINOIS DOMESTIC SUPPLY SYSTEMS: <br /> PLUMBING CODE, ALL LOCAL CODES, AND ACCEPTABLE TO THE AUTHORITY 1. THE INCOMING WATER SERVICE PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. <br /> HAVING JURISDICTION, FROM THE EXITING SANITARY PIPE. WHERE A 5 FT. SEPARATION IS NOT ------------- TEMPERED WATER PIPING (110'F) AV� ATMOSPHERIC VpCUUM BREAKER <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM <br /> 2. ALL INSTANCES OF CONFLICT BETWEEN DRAWINGS AND PLUMBING CODE, 2014 OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. <br /> ILLINOIS PLUMBING CODE SHALL SUPERCEDE DRAWINGS. HOT WATER PIPING 140'F BSI BEVERAGE SYSTEM INSTALLER <br /> 2. ALL UNDERGROUND SITE PLUMBING SHALL CONFORM TO NSF 61, SHALL BE ' ° � � � ) z <br /> 3. ALL PLUMBING WORK SHA�L BE PERFORMED BY A LICENSED PLUMBER. TYPE K COPPER TUBING OR COPPER PIPE, POLYETHYLENE (PE) OR CPVC. a <br /> IF CPVC IS USED, FOAM INSULATION SHALL BE INSTALLED AT ALL CHANGES � � � � � � <br /> 4. ALL DIMENSIONS, CLEARANCES AND TOLERANCES SHALL BE VERIFIED PRIOR OF DIRECTION TO ACCOUNT FOR EXPANSION AND CONTRACTION. - � � - • � • - RECIRCULATED HOT WATER PIPING CO CLEAN-OUT z w <br /> TO INSTALLATION. ALL ROUGH-IN LOCATIONS SHALL BE COORDINATED WITH <br /> 0 0 <br /> THE MANUFACTURER'S SUBMITTAL INFORMATION. 3. INCOMING WATER SERVICE PRESSURE SHOULD BE BETWEEN 45 AND 55 PSI v_� <br /> STATIC. WHERE WATER PRESSURE SERVICE EXCEEDS 80 PSI STATIC, AN -- --- ---- ---- ---- ---- - OVERHEAD LINES (BY P.C.) DC DOWNSPOUT COVER W <br /> 5. ALL DIMENSIONAL INFORMATION IS AS FOLLOWS (UNLESS NOTED OTHERWISE): APPROVED WATER-PRESSURE REDUCING VALVE WITH STRAINER CONFORMING °C <br /> A. UNDERGROUND PIPE IS TO FOUNDATION TO ASSE 1003 SHALL BE INSTALLED. WHERE INCOMING WATER PRESSURE IS <br /> B. OVERHEAD PIPE IS TO FINISHED WALL BELOW 45 PSI STATIC, A PRESSURE BOOSTER SYSTEM SHALL BE INSTALLED. --SAN-- UNDERGROUND SANITARY PIPING DFU DRAINAGE FIXTURE UNIT(S) <br /> C. ELEVATIONS ARE TO FINISHED FLOOR <br /> 4. IF THE RESTAURANT HAS A COMBINED WATER AND FIRE SPRINKLER SERVICE, <br /> 5. ALL MATERIALS, FIXTURES AND EQUIPMENT USED SHALL BE IN ACCORDANCE THE INCOMING WATER SERVICE SHALL BE SIZED BASED ON THE FIRE <br /> WITH MCDONALD'S SPECIFICATIONS. SPECIFICATIONS ARE CONTAINED WITHIN SPRINKLER CONTRACTOR'S ITYDRAULIC CALCULATIONS. --Gw -- UNDERGROUND GREASE WASTE PIPING EC ELECTRICAL CONTRACTOR <br /> THESE DRAWINGS AND THE MCDONALD'S PROJECT MANUAL. ANY CONTRACTOR <br /> IN NEED OF A COPY OF THE MCDONALD'S PROJECT MANUAL SHALL CONTACT 5. PROVIDE A MINIMUM Y2" ANNULAR CLEARANCE AROUND ALL PIPE SLAB VENT PIPING FAC FIRE ALARM CONTRACTOR <br /> ------------- <br /> PENETRATIONS. <br /> THE MCDONALD'S AREA CONSTRUCTION MANAGER. ANY VARIANCE FROM THE � <br /> MCDONALD'S SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE o � � � � � <br /> ENGINEER-OF-RECORD. 6. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE � ABOVE GROUND STORM PIPING FCO FLOOR CLEAN-OUT <br /> INSTALLED AT THE INCOMING SERVICE WHERE REQUIRED BY CODE. <br /> 6. SEE COORDINATION SCHEDULE FOR ADDITIONAL SCOPE OF WORK. z � � � � � <br /> 7. AN EXPANSION TANK SHALL BE INSTALLED ON THE COLD WATER LINE INLET <br /> 7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ITS LISTING TO THE WATER HEATER. SEE EXPANSION TANK SCHEDULE. -- ST -- UNDERGROUND STORM PIPING FD FLOOR DRAIN <br /> SEAL <br /> AND/OR THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. g, ALL WATER SUPPLY PIPE WITHIN 5 �i'. OF THE BUILDING AND INSIDE THE <br /> 8. WHERE POOR SOIL CONDITIONS EXIST OR WHERE SUBSTANTIAL SETTLEMENT BUILDING SHALL COMP�Y WITH NSF 61 AND SHALL BE TYPE L COPPER �' HOSE BIBB FPC FIRE PROTECTION CONTRACTOR ,��, G. �^�� <br /> OF EITHER THE PIPING, THE BUILDING OR ADJACENT WALKS, PLANTERS, ETC., TUBING, COPPER PIPE OR CPVC PIPE. g"�' u� �A��� <br /> MAY OCCUR, THE CONTRACTOR SHALL PROVIDE ADEQUATE UNDERSLAB � � �4 �����' <br /> STAINLESS STEEL PIPE HANGERS OR APPROVED OTHER SUPPORT. 9• CPVC PIPE SHALL BE FLOWGUARD GOLD OR FLOWGUARD BENDABLE AS 1\I CHECK VALVE FS FLOOR SINK �v�� °� <br /> MANUFACTURED BY LUBRIZOL. <br /> 9. ALL PIPE SLEEVES SHALL BE PROPERLY SEALED AND INSULATED TO PREVENT *o � <br /> HEAT LOSS AND SEEPAGE. 10. CPVC PIPE SHALL BE CONNECTED WITH FLOWGUARD GOLD YELLOW LOW-VOC � BALL VALVE GC GENERAL CONTRACTOR �SA� 37�gp ��W <br /> SOLVENT CEMENT AS MANUFACTURED BY IPS WELD-ON OR OATEY. .,p ?� wo <br /> 10. ALL PIPE INSULATION SHALL BE PROTECTED FROM DAMAGE FROM PIPE ����R � <br /> P T TION SHALL BE LIGHT GAUGE GALVANIZED STEEL OR � 1. ALL CPVC PIPE SHALL BE INSULATED TO PREVENT EXPOSURE TO GREASE. I�b THERMOSTATIC MIXING VALVE GI GREASE INTERCEPTOR ��s�������� <br /> HANGERS. RO EC <br /> EQUAL. 12. ALL SUSPENDED PIPE SHALL BE SUPPORTED AS FOLLOWS: Ex�� �S /0 �" <br /> 11. ALL PENETRATIONS OF FIRE-RATED WALLS SHALL BE FIRESTOPPED WITH AN MATERIAL MAX. HORIZ. SPACING MAX. VERT. SPACING � FLOOR DRAIN GPF GALLONS PER FLUSH 4jrd � <br /> APPROVED AND LISTED FIRESTOPPING SYSTEM. COPPER PIPE 12 F�i". 10 FT. <br /> SANITARY AND VENT SYSTEMS: COPPER TUBING <1Y4" 6 FT. 10 FT. <br /> 1. THE BUILDING SANITARY PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. FROM COPPER TUBING >1Y2" 10 FT. 10 FT. � CLEAN-OUT (FLOOR OR YARD) GPM GALLONS PER MINUTE �� o ` N <br /> THE INCOMING WATER SERVICE. WHERE A 5 FT. SEPARATION IS NOT CPVC <1" 3 FT. 10 FT. z o�- � � N <br /> � <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM CPVC >1Y4" 4 FT. 10 F�T. FLOOR SINK GW GREASE WASTE � r°'n n.�L �'w� �� <br /> FT <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. a � � o � �, � <br /> 13. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE � L � `� _ � <br /> 2. ALL SANITARY AND VENT PIPE SHALL BE PVC TYPE DWV, ABS OR CAST-IRON INSTALLED AT THE INLET TO THE WATER FILTRATION SYSTEM. ALL PIPING " ,� 3= � � 3 N � �: <br /> DOWNSTREAM OF THE RPZ SHALL BE COPPER OR CROSS-LINKED rr� PRESSURE GUAGE HS HAND SINK W .�-�•� � _ � „3 � � <br /> WHERE REQUIRED BY CODE. -- o_ <br /> POLYETHYLENE (PEX). v >.a�i °'N -�o C `o_ <br /> 3. ALL HORIZONTAL SANITARY PIPE SHALL BE INSTALLED WITH A MINIMUM PITCH � T � � <br /> � E Z- � � o <br /> 14. ALL DEVICES, APPLIANCES, AND APPARATUS INTENDED TO SERVE SOME " ° � a��° °' �a <br /> AS FOLLOWS: SPECIAL FUNCTION SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW ��� LOW PRESSURE SWITCH I.P.S. IRON PIPE SIZE (ALSO NPS) � o >,� �-• � X <br /> _v� w v �v� � w <br /> PIPE SIZE MIN. SLOPE AND CONTAMINATION OF THE WATER SUPPLY SYSTEM. ALL BACKFLOW <br /> ' 2X�" OR LESS Ya" PER FT. PREVENTION DEVICES SHALL BE ASSE LISTED AND APPROVED FOR THE DEVICE � � o „ � <br /> 3" TO 6" Ys" PER FT. OR APPLIANCE THEY SERVE. � HIGH PRESSURE SWITCH KEI KITCHEN EQUIPMENT INSTALLER a � <br /> '' � � 3 <br /> N N � o � � <br /> 8" OR LARGER Y�s" PER FT. �5. ALL WATER SUPPLY LINES SHALL BE PROVIDED WITH A QUARTER-TURN ��i � p ��� 3 � _ <br /> 4. CLEANOUTS SHALL BE IN S T A L L E D I N A L L H O R I Z O N T A L D R A I N A G E P I P E A N D S H U T-OF F VA LV E BEFORE FINAL CONNECTION TO E QUIPMENT. ��V SOLENOID VALVE KES KITCHEN EQUIPMENT SUPPLIER 3 d 3 <br /> SHALL BE LOCATED NOT MORE THAN 100 FT. APART. 3 G U <br /> � � � � � W W <br /> 16. QUARTER-TURN SHUT-OFF VALVES SHALL BE INSTALLED UPSTREAM OF ANY - O �a � ° W W <br /> INLINE BACKFLOW PREVENTION DEVICE. ~ " THREE-WAY VALVE LAV LAVATORY � '� �� a o �`W <br /> 5. C L E A N O U T S S H A L L B E I N S T A L L E D A T A L L C H A N G E S O F D I R E C T I O N G R E A T E R '� � x <br /> Z .c c � u <br /> THAN 45 DEGREES. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS C7 °-°o = �e W <br /> 17. ALL VALVES AND BACKF�OW PREVENTION DEVICES SHALL BE INSTALLED WITH :__- cn <br /> IN A SINGLE PIPE RUN, ONLY ONE (1) CLEANOUT SHALL BE REQUIRED FOR FITTINGS THAT FACILITATE REMOVAL IN CASE OF FAILURE. � � � W <br /> EVERY 40 FEET OF DEVELOPED LENGTH. C=C..}� PRESSURE REGULATOR MC MECHANICAL CONTRACTOR � � M � z <br /> 6. CLEANOUTS SHALL BE INSTALLED ON PIPES PRIOR TO ANY SLAB 18. ALL OVERHEAD WATER LINES SHALL BE INSUtATED WITH 1" THICK EXTERNAL <br /> PENETRATION. JACKETED INSULATION AND A MINIMUM INSTALLED R-VALUE OF 3.7. '�\,! DUAL CHECK VALVE OR RPZ MHT MALE HOSE THREADS <br /> 7. WHERE PIPING IS LOCATED WITHIN WALL CAVITIES, ACCESS TO THE CLEANOUTS 19. PRIOR TO BUILDING TURNOVER, THE DOMESTIC WATER SUPPLY SYSTEM SHALL `� <br /> BE PURGED OF DELETERIOUS MATERIAL AND DISINFECTEDo DISINFECTION '` DUAL CHECK VALVE WITH ATMOSPHERIC � <br /> SHALL BE PROVIDED. �"`( MS MOP SINK <br /> SHALL BE DONE IN ACCORDANCE WITH THE LOCAL HEALTH CODE, PLUMBING VENT o0 <br /> 8. CLEANOUTS ON 6-IN. AND SMALLER PIPES SHALL BE PROVIDED WITH A CODE OR IN ACCORDANCE WITH AWWA C651 OR AWWA C652. � <br /> CLEARANCE OF NOT LESS THAN 18 IN. CLEANOUTS ON 8-IN. AND LARGER STRAINER NPS NATIONAL PIPE THREAD STANDARD j <br /> PIPE SHALL BE PROVIDED WITH A CLEARANCE OF NOT LESS THAN 36 IN. ~ <br /> > <br /> 9. ALL SUSPENDED SANITARY AND VENT PIPE SHALL BE SUPPORTED AS � <br /> FOLLOWS: <br /> �' RELIEF VENT NPT NATIONAL PIPE THREAD TAPERED � <br /> i�,;: <br /> w <br /> MAX. HORIZ. MAX. VERT. � <br /> MATERIAL SPACING SPACING <br /> 0/0 OWNER/OPERATOR � <br /> ABS 4 FT. 10 FT. <br /> . PVC (TYPE DWV) 4 FT. 10 FTa <br /> CAST-IRON (<10 FT. PIPE SECTIONS) 5 FT. 15 FT. OH OVERHEAD zo <br /> CAST-IRON (10 FT. PIPE SECTIONS) 10 FT. 15 FT. � <br /> a <br /> 10. ALL PLUMBING FIXTURES SHALL BE VENTED AND THE MAXIMUM DISTANCE P PUMP o <br /> FROM THE FIXTURE TRAP TO THE VENT SHALL BE AS FOLLOWS: <br /> LL <br /> TRAP SIZE SLOPE DISTANCE Z <br /> 1y4" Y4" PER FT. 2'-6" PC PLUMBING CONTRACTOR G <br /> 11�" y4" PER FT. 3'-6" � <br /> 2" y4�� PER FT. 5'-p,� a <br /> 3" �" PER FT. 6'-0" RC REFRIGERATION CONTRACTOR <br /> 4" & LARGER Ya" PER FT. 10'-0" <br /> 11. ALL PLUMBING VENTS THROUGH THE ROOF SHALL TERMINATE A MINIMUM OF RPZ REDUCED PRESSURE PRINCIPLE <br /> � 12 INCHES ABOVE THE ROOF AND SHALL BE LOCATED A MINIMUM OF 8 FT. BACKFLOW PREVENTER <br /> FROM ANY PARAPET WALL. WHERE A VENT TERMINATES WITHIN 8 FT. OF A <br /> PARAPET WALL, THE VENT SHALL TERMINATE A MINIMUM OF 6 INCHES ABOVE SS SANITARY SEWER � Q <br /> THE PARAPET. <br /> 12. ALL PLUMBING VENTS SHALL TERMINATE A MINIMUM OF 10 FT. HORIZONTALLY O N � <br /> FROM ANY OUTDOOR AIR INTAKE. WHERE A PLUMBING VENT IS LOCATED ST STORM SEWER Z � m <br /> WITHIN 10 FT. OF AN INTAKE, THE VENT SHALL TERMINATE A MINIMUM OF 2 � � <br /> FT. ABOVE THE INTAKE. SVB ANTI-SIPHON, SPILL RESISTANT W p U <br /> VACUUM BREAKER Z � O <br /> 13. ALL SIDE WALL VENT TERMINATIONS SHALL BE PROTECTED TO PREVENT BIRDS v <br /> OR RODENTS FROM ENTERING OR BLOCKING THE VENT OPENING. � � � <br /> TAB TEST AND BALANACE CONTRACTOR <br /> 14. ALL FLOOR DRAINS THAT DO NOT SERVE EQUIPMENT SHALL BE PROTECTED <br /> � � AGAINST DRYING OUT EITHER THROUGH THE INSTALLATION OF A TRAP PRIMER, rn � � � <br /> � DEEP SEAL TRAP OR PROSET TRAP GUARD. UG UNDERGROUND <br /> o � <br /> � � w <br /> a- 15. ALL APPLIANCES SHALL DRAIN TO AN APPROVED SANITARY WASTE RECEPTOR � � � m <br /> c��, (FLOOR SINK OR FLOOR DRAIN WITH FUNNEL). 1NDIRECT DRAINAGE FROM AN UR URINAL � o o Z � <br /> � APPLIANCE SHALL MAINTAIN AN AIR GAP BETWEEN THE PIPE OUTLET AND THE <br /> v TOP OF THE RECEPTOR. THE MINIMUM DISTANCE BETWEEN THE PIPE OUTLET Z � � <br /> � AND THE TOP OF THE RECEPTOR SHALL BE TWICE THE DIAMETER OF THE <br /> V VENT Q � O� <br /> N APPLIANCE DRAIN PIPE. � o o � N O <br /> � WC WATER CLOSET N � � m o o � <br /> o w � z i3 Q <br /> � z <br /> a WCO WALL CLEAN-OUT � ~ a <br /> � Q � � <br /> d� � o o � <br /> � 3 <br /> � - <br /> � SHEET NUMBER <br /> J WSFU WATER SUPPLY FIXTURE UNIT(S) <br /> a <br /> rn <br /> oYC YARD CLEAN-OUT " ' • O <br /> � P <br /> � <br /> 0 <br /> 0 <br /> � <br /> _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.