Laserfiche WebLink
_ _ _ _____ __. . __ _ _ ._ _ __ . .. <br /> _ ___ ___ _. , <br /> _ . __ ___ __ _ _ __ <br /> _ _ . _ _ _ _ _ _ _ _ _ . <br /> _ _ _ --- -- - - - -,._ . <br /> • ,,,_ _ <br /> COORDINATION SCHEDULE BACKFLOW PREVENTER SCHEDULE <br /> FINAL NOTES: <br /> 1. THIS SCHEDULE IS INTENDED AS A GUIDE FOR THE WORK TO BE ASSE <br /> GENERAL REQUIREMENTS FURNISH INSTALL CONNECTION NOTES PERFORMED. ALL WORK SHALL BE COORDINATED BETWEEN THE McDONALD'S NPE MFR. MODEL LISTING SERVES �OCATION <br /> MECHANICAL PERMIT MC 1-3 AREA CONSTRUCTION MANAGER AND ALL GC AND 0/0 SUBCONTRACTORS. AG FURN. WITH CHEM. SYS. 1055B CHEMICAL SYSTEM KITCHEN-MOP SINK <br /> HOT WORK (WELDING) PERMIT (IF APPLICABLE) KES �-3 AVB FURN. WITH FAUCET - MOP SINK FAUCET SEE DRAWINGS <br /> REFRIGERATION PERMIT (IF APPLICABLE) MC 1-3 2. ONE (1) COPY OF THE DECOR PACKAGE DRAWINGS SHALL BE SUPPLIED TO <br /> PLUMBING PERMIT PC 1-3 THE GENERA� CONTRACTOR AND EACH OF THE SUBCONTRACTORS. IT SHALL VALVE S C H E D U L E <br /> ELECTRICAL PERMIT EC 1-3 BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND THE Z <br /> FIRE SPRINKLER PERMIT (IF APPLICABLE) FPC 1-3 SUBCONTRACTORS TO INSURE THAT THEY HAVE RECEIVED THE DECOR � <br /> PACKAGE DRAWINGS. a <br /> FIRE ALARM PERMIT IF APPLICABLE) FAC 1-3 TEMP. � � � � � � <br /> CONTRACTOR COORDINATION REQUIREMENTS 3. FOR ANY WORK NOT CLARIFIED IN THIS SCHEDULE OR IN THE NOTES AND MANUFACTURER MODEL SETTING LISTING SERVES N v�i <br /> WATTS LFMMV 110'F ASSE 1017,1069,1070 CHEMICAL SYSTEM MIXING o � <br /> HEATING & AIR-CONDITIONING SPECIFICATIONS, PLEASE CONSULT THE McDONALD'S AREA CONSTRUCTION �, <br /> MANAGER FOR SCOPE OF WORK. WATTS LFMMV 104'F ASSE 1017,1069,1070 LAVS & HAND SINKS MIXING j <br /> ROOFTOP UNITS, INTAKE AND RELIEF MC MC 1-5, 17, 22 ZURN ZW3870XLT 104'F � <br /> ROOF CURBS MC MC 1-3, 20, 22 4. ALL ROOFTOP UNIT EQUIPMENT SUPPLIED BY THE MECHANICAL CONTRACTOR NIBCO 585-70-HC - - CHEMICAL SYSTEM SHUT-OFF <br /> GAS PIPING AND GAS PIPE KIT PC PC PC 1-3, 14, 22-23 AND THE KITCHEN EQUIPMENT SUPPLIER SHALL BE ON SITE AT THE SAME NIBCO S-FP-600A-LF - - RESTROOM SHUT-OFF <br /> CONTROLS WIRING MC EC EC 1-3, 19, 22, 24 TIME FOR A SINGLE CRANE �IFT. EQUIPMENT SITE ARRIVAL DATE SHALL BE <br /> POWER WIRING EC EC EC 1-3, 19, 22, 24 COORDINATED BETWEEN THE AREA CONSTRUCTION MANAGER, MECHANICAL P L U M B I N G F I XT U R E S C H E D U L E <br /> CONDENSATE TRAP MC PC 1-3, 22-23 CONTRACTOR AND KITCHEN EQUIPMENT SUPPLIER. <br /> CONDENSATE PIPING (IF APPLICABLE) PC PC 1-3, 22-23 � TAG DESCRIPTION MANUFACTURER MODEL WATER USE ACCESSORIES/COMMENTS <br /> DUCT-MOUNTED SMOKE DETECTOR MC MC EC 1-3, 22, 24 5. ALL ROOFTOP UNITS INSTALLED IN McDONALD S RESTAURANTS SHALL BE HIGH <br /> EFFICIENCY EQUIPMENT. THE INSTALLATION OF STANDARD EFFICIENCY TOTO TEL101-D10E#CP 1.0 GPM FAUCET OPERATION: SENSOR <br /> GENERAL EXHAUST SYSTEMS ROOFTOP UNITS IS PROHIBITED. F-1 FAUCET FOR LAV-1 ZURN Z6950-XL-S-IOS-LL 0.17 GAL/1 <br /> EXHAUST FANS MC MC 1-3, 17, 22 SEC CYCLE) Q , , , , , <br /> ROOF CURBS MC MC 1-3, 22 6. ALL KITCHEN EQUIPMENT REQUIRING EXHAUST SHALL BE INSTALLED IN ZURN Z843M4 FAUCET OPERATION: MANUAL 5' VINYL HOSE � <br /> CONTROLS WHERE APPLICABLE MC EC EC 1-3, 22, 24 ACCORDANCE WITH THESE PLANS. ANY VARIATION FROM THESE PLANS SHALL F-2 FAUCET FOR MS-1 <br /> � ) SEE DETAIL 2 ON DRAWING P3.0 WALL HOOK <br /> BE REPORTED TO THE AREA CONSTRUCTION MANAGER AND THE o � � � � � <br /> POWER WIRING EC EC EC 1-3, 22, 24 ENGINEER-OF-RECORD. ZURN Z415-SZ PIPE SIZE: 3" FUNNEL: NONE Z <br /> TEMPERATURE CONTROLS FD-2 6x6 FLOOR DRAIN ,1AY R. SMITH 2O05 STRAINER SIZE: 6" NICKEL BRONZE SEE NOTE 8 <br /> THERMOSTATS & SUBBASES MC MC EC 1-3, 22, 24 7. WHERE GYPSUM BOARD CEILINGS ARE INSTALLED, THE MECHANICAL KOHLER K-2882-0 FAUCET: F-1 SEE NOTE 10 SEAL <br /> REMOTE SENSORS (RH AND/OR TEMPERATURE) MC MC EC 1-3, 22, 24 CONTRACTOR SHALL SUPPLY DRYWALL MOUNTING FRAMES FOR LAY-IN TYPE �,qV-1 LAVATORY TRUEBRO LAVGUARD2 MODEL #102-E-Z SEE DETAIL 1 ON P3.0 <br /> DIFFUSERS AND FACE-ACCESSIBLE VOLUME DAMPERS TO FACILITATE AIR <br /> CONTROLS WIRING (WHERE APPLICABLE) MC EC EC 1-3, 22, 24 CORIAN COUNTER BY G.C. � ,� <br /> POWER WIRING EC EC EC 1-3, 22, 24 BALANCING. FAUCET• F-2 p��F � �A���� <br /> ZURN Z1996-24-HH-WG � � <br /> DUCTWORK AND ACCESSORIES 8. NOT USED. MS-1 MOP SINK INCLUDES HOSE, HOSE BRACKET AND TWO (2) 24"Wx36"H WALL GUARDS ,��'� , ���`�' <br /> GALVANIZED SHEET METAL DUCTWORK MC MC 1-3, 22 SEE DETAIL 2 ON P3.0 <br /> 9. NOT USED. <br /> EXTERNAL INSULATION MC MC 1-3, 22 TOTO UT445U#01 FLUSH VALVE: TOTO TEU 1 UA12#CP FLUSH VALVE OPERATION: SENSOR ,� �, <br /> INTERNAL INSULATION (IF APPLICABLE) MC MC 1-3, 22 UR-1 ADA WALL-HUNG URINAL ZURN Z5755 0.5 GPF ZURN ZTR6203-ULF-LL SEE NOTE 2 <br /> WEATHERPROOFING IF APPLICABLE MC MC �_3 22 10. THE BEVERAGE SYSTEM INSTALLER FURNISHES, RUNS AND CONNECTS ALL _ _ 3/4" I.P.S., 1" TOP SPUD ��� ������� �'� <br /> S PIN-IN COLLARS ( > MC M C 1-3, 2 2 THE IBOLLOW NG AND SYRUP LINES FOR ALL AFFECTED EQUIPMENT INCLUDING TOTO CT705EN#01 FLUSH VA�VE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR ��S�aA�L'���� <br /> FLEXIBLE DUCTWORK MC MC 1-3, 22 A. HOT CHOCOL4TE WC-1 WATER CLOSET ZURN Z5655 1.28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 2155CT <br /> VOLUME/BALANCING DAMPERS MC MC �-3, 22 B. COFFEE BREWER _ _ 1" I.P.S., 1Y2" TOP SPUD �x�� �S r� S � <br /> C. ICE MACHINE '"'� <br /> FIRE DAMPERS (IF APPLICABLE) MC MC 1-3, 22 D. O.J. TOTO CT705ELN#01 FLUSH VALVE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR sjro rA <br /> FIRESTOPPING (IF APPLICABLE) MC MC 1-3, 22 E. SODA TOWERS WC-2 ADA WATER CLOSET ZURN Z5665 1.28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 2155CT <br /> AIR DEVICES AND ACCESSORIES MC MC MC 1-3, 7, 22, 28 _ _ 1" I.P.S., 11�Z" TOP SPUD <br /> PLUMBING SYSTEMS 11. ALL WATER HEATERS INSTALLED IN McDONALD'S RESTAURANTS SHALL BE HIGH NOTES• TO ORDER PLUMBING FIXTURES, �� � <br /> EFFICIENCY SEALED-COMBUSTION WATER HEATERS. THE INSTALLATION OF � CONTACT HD SUPPLY: �'�' a � N <br /> WATER HEATERS PC PC PC 1-3, 1 1-12, 23 STANDARD EFFICIENCY GRAVITY-VENTED WATER HEATERS IS PROHIBITED. �• SEE McDONALD S PROJECT MANUAL FOR ADDITIONAL MANUFACTURERS Z o-�- � „ <br /> HOT AND COLD WATER PIPE PC PC PC 1-3, 23 2. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER URINAL SUPPORT PHONE: (866) 310-3576 p �,,a�,� C o 0 <br /> VENTS AND INTAKES PC PC PC 1-3, 23 E-M A I L: M C D C O O R D O H D S U P P L Y.C O M � � a�� _�� ,�� <br /> 12. THE AREA CONSTRUCTION MANAGER, PLUMBING CONTRACTOR AND KITCHEN 3. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE INTERIOR BLOCKING ON W/W BUILDING FOR WALL CLAMP a u� ` � o o, ,.,� a <br /> T H E R M O S T A T I C M I X I N G V A L V E P C P C P C 1-3, 2 3 EQUIPMENT SUPPLIER SHALL COORDINATE WHICH 3-COMPARTMENT SINK IS 4. Y A R D H Y D R A N T I S F O R T R A S H C O R R A L - S E E S I T E PLAN FOR LOCATION � LL � ;��� N s � � <br /> POWER AND CONTROL WIRING EC EC EC 1-3, 23-24 BEING INSTALLED IN THE RESTAURANT. NOTE: THE INSTALLATION OF A 5. PLUMBING CONTRACTOR SHALL ROUTE N�" DRAIN PIPE FROM HOSE BIBB TO NEAREST FLOOR DRAIN OR FLOOR SINK � L � � � �°3 � o <br /> POWERSOAK SINK REQUIRES A LARGER WATER HEATER THAN THE STANDARD 6. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER SINK SUPPORT v �'� o°•�s,� C � <br /> KITCHEN EXHAUST SYSTEMS 3-COMPARTMENT SINK. 7. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION - PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION WITH K.E.S. :�'-'� �� ,,` ° � :� <br /> McDONALD'S BACKSHELF EXHAUST HOODS KES KEI 1-3, 6, 22, 27 8. PLUMBING CONTRACTOR SHALL SPECIFY CONNECTION MATERIAL/TYPE WHEN ORDERING � ' � °' , °'� = o <br /> CANOPY EXHAUST HOODS (IF APPLICABLE) KES KEI 1-3, 6, 22, 27 13. ALL GAS PIPING FOR COOKING EQUIPMENT SHALL TERMINATE IN THE CEILING 9. PLUMBING CONTRACTOR SHALL SPECIFY BURY DEPTH WHEN ORDERING `�$�� o �v� � w <br /> BLACK IRON DUCTWORK KES KEI 1-3, 6, 22 PRIOR TO THE INSTALLATION OF THE PIPING CHASEo UPON INSTALLATION OF 10. PLUMBING CONTRACTOR SHAL� PROVIDE GRID DRAIN, P-TRAP AND VALVE STOPS FOR ALL SINKS & LAVS <br /> STAINLESS STEEL DUCTWORK (IF APPLICABLE) KES KEI 1-3, 6, 22 THE CHASE, THE GAS PIPING SHALL THEN BE CONTINUED IN THE CHASE FOR v � o Y <br /> ALUMINUM DUCTWORK (IF APPLICABLE) KES KE� 1-3, 6, 22 FINAL CONNECTION TO THE APPLIANCE. � n; 00„ �, o 0 <br /> N N � o � � <br /> UL LISTED DUCT WRAP MC MC 1-3, 6, 22 14. ALL GAS PIPING FOR ROOFTOP EQUIPMENT SHALL BE BROUGHT UP THROUGH m Z -� ; W a <br /> FIRE-RATED DUCT ENCLOSURE (IF APPLICABLE) GC GC 1-3, 6, 20, 22 PIPE PORTALS ON ROOF. ■ v o s „d ; �_ <br /> EXHAUST FANS MC MC 1-3, 6, 17, 22 H �Y � 3 G v <br /> ROOF CURBS MC MC 1-3, 6, 20, 22 15. FIRE SPRINKLER DRAWINGS SHALL BE DESIGNED AND PERMITTED BY A FIRE <br /> � � " 10 � av <br /> O o'oN � � W <br /> P R O T E C T I O N C O N T RACTOR OR LICENSED FIRE PROTECTION ENGINEER. v� � � � � _� <br /> CURB EXTENSIONS MC MC 1-3, 6, 22 � Z L � 3 � v <br /> CONTROLS (WHERE APPLICABLE) EC EC EC 1-3, 6, 22, 24 16. ALL R-102 WET CHEMICAL FIRE SUPPRESSION SYSTEMS FOR T Y P E I H O O D S � 0°o � � W <br /> P O W E R W I R I N G E C E C E C 1-3, 6, 2 2, 2 4 SHALL BE DESIGNED AND INSTALLED BY A LOCAL ANSUL AGENT. THE USE � u`n,i N� o Z <br /> FIRE SUPPRESSION SYSTEM KES KES KES 1-3, 16, 22, 27 OF DRY CHEMICAL SYSTEMS IS PROHIBITED. THE LOCAL ANSUL AGENT � M = - <br /> KITCHEN EQUIPMENT CONTRACT IS HAND�ED THROUGH THE KITCHEN EQUIPMENT SUPPLIER. <br /> COOLER/FREEZER KES GC 1-3, 27 17. WHERE POSSIBLE, ALL ROOFTOP UNITS AND EXHAUST FANS ARE SUPPLIED <br /> EVAPORATOR COILS KES MC �-3° 2� WITH A FACTORY-INSTALLED DISCONNECT SWITCH. � <br /> CONDENSATE PIPING PC PC PC 1-3, 23, 27 <br /> REMOTE CONDENSING UNIT (MAC) KES MC 1-3, 22, 27 18. ELECTRICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES FOR REMOTE � ' <br /> ROOF CURBS MC MC 1-3, 22 CONDENSING UNITS. <br /> REFRIGERANT PIPING KES MC MC 1-3, 22, 27 � <br /> POWER WIRING EC EC EC 1-3, 22, 24, 27 19. ALL ELECTRICAL CONDUITS FOR ROOFTOP EQUIPMENT SHALL BE BROUGHT UP Q <br /> THROUGH PIPE PORTALS ON ROOF. > <br /> CONTROL WIRING EC EC EC 1-3, 24, 27 > <br /> PIPE PORTALS MC MC �-3� 22 20. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. � - <br /> ICE MACHINES KES KEI 1-3, 27 � <br /> WATER SUPPLY PIPING KES KEI BSI 1-3, 27 21. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. w <br /> � <br /> w <br /> REMOTE CONDENSING UNITS KES MC 1-3� 22, 2� 22, SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. � <br /> ROOF CURBS MC MC 1-3, 22, 27 w <br /> REFRIGERANT PIPING KES MC MC 1-3, 22, 27 23. SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. <br /> POWER WIRING EC EC EC 1-3, 22, 24, 27 0 <br /> CONTROL WIRING KES EC EC 1-3, 24, 27 24. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. � � <br /> a <br /> PIPE PORTALS MC MC 1-3, 22 g <br /> GRILLS KES KES 1-3, 27 <br /> 25. SEE FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION. o <br /> GAS PIPING (IF APPLICABLE) PC PC PC 1-3, 23, 27 26. SEE FIRE ALARM DRAWINGS FOR ADDITIONAL INFORMATION. ? <br /> POWER WIRING EC EC EC 1-3, 24, 27 G <br /> CONTROL CABLE (6' CLAMSHELL ONLY) MC EC EC 1-3, 23, 240 27 27. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION. � <br /> 0 <br /> FRYERS KES KES �-3' 2� 28. SEE DECOR DRAWINGS FOR ADDITIONAL INFORMATION. °- <br /> GAS PIPING (IF APPLICABLE) PC PC PC 1-3, 23, 27 <br /> POWER WIRING EC EC EC 1-3, 24, 27 <br /> 3-COMPARTMENT SINK KES KES 1-3, 12, 27 <br /> FAUCETS AND PRE-RINSE SPRAYER KES KES 1-3, 27 <br /> WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 • <br /> SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 W � <br /> HAND SINKS PC PC 1-3, 23, 27 Q <br /> FAUCEf PC PC 1-3, 23, 27 N cn } <br /> WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 J � m <br /> SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 � � O <br /> VEGETABLE SINK KES KES 1-3, 23, 27 p � U <br /> FAUCET KES KES 1-3, 23, 27 = � � <br /> U <br /> WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 N � p� <br /> SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 <br /> WASHING MACHINE KES KES 1-3, 23, 27 <br /> � N � � <br /> � WATER SUPPLY PIPING PC PC PC - , o � o cn � <br /> � SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 � I <br /> a WARE WASHER KES KES 1-3, 23, 27 � � m ` <br /> rn WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 Z � N � <br /> M <br /> N SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 <br /> W O <br /> � Z � <br /> v MISCELLANEOUS ITEMS <br /> o FIRE SPINKLER SYSTEMS FPC FPC FPC 1-3, 15, 25 a � � <br /> 0 <br /> N HVAC EQUIPMENT START-UP TAB 1-3, 22 � •• c~n O <br /> � TEST, ADJUST AND BALANCE HVAC SYSTEMS TAB 1-3, 22 W Z � m Q � <br /> � DOOR GRILLES (IF APPLICABLE) MC GC 1-3, 20, 22 N � N m o 0 <br /> � ROOF/WALL OPENINGS GC 1-3, 20-24 w � z w Q <br /> a APPLIANCE BACKFLOW PREVENTION KES/BSI PC PC 1-3, 23, 27 0 � Q � z <br /> � CO2 DETECTION SYSTEM MC EC EC 1-3, 22, 27 a o o � <br /> � - <br /> � SHEET NUMBER ` <br /> � "_'_ _ <br /> � <br /> rn <br /> 3 <br /> ° 4 . 1 =- <br /> 0 <br /> o . . <br /> � � . <br /> _ <br />