<br /> COORDINATION SCHEDULE BACKFLOW PREVENTER SCHEDULE
<br /> FINAL NOTES:
<br /> 1. THIS SCHEDULE IS INTENDED AS A GUIDE FOR THE WORK TO BE ASSE
<br /> GENERAL REQUIREMENTS FURNISH INSTALL CONNECTION NOTES PERFORMED. ALL WORK SHALL BE COORDINATED BETWEEN THE McDONALD'S NPE MFR. MODEL LISTING SERVES �OCATION
<br /> MECHANICAL PERMIT MC 1-3 AREA CONSTRUCTION MANAGER AND ALL GC AND 0/0 SUBCONTRACTORS. AG FURN. WITH CHEM. SYS. 1055B CHEMICAL SYSTEM KITCHEN-MOP SINK
<br /> HOT WORK (WELDING) PERMIT (IF APPLICABLE) KES �-3 AVB FURN. WITH FAUCET - MOP SINK FAUCET SEE DRAWINGS
<br /> REFRIGERATION PERMIT (IF APPLICABLE) MC 1-3 2. ONE (1) COPY OF THE DECOR PACKAGE DRAWINGS SHALL BE SUPPLIED TO
<br /> PLUMBING PERMIT PC 1-3 THE GENERA� CONTRACTOR AND EACH OF THE SUBCONTRACTORS. IT SHALL VALVE S C H E D U L E
<br /> ELECTRICAL PERMIT EC 1-3 BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND THE Z
<br /> FIRE SPRINKLER PERMIT (IF APPLICABLE) FPC 1-3 SUBCONTRACTORS TO INSURE THAT THEY HAVE RECEIVED THE DECOR �
<br /> PACKAGE DRAWINGS. a
<br /> FIRE ALARM PERMIT IF APPLICABLE) FAC 1-3 TEMP. � � � � � �
<br /> CONTRACTOR COORDINATION REQUIREMENTS 3. FOR ANY WORK NOT CLARIFIED IN THIS SCHEDULE OR IN THE NOTES AND MANUFACTURER MODEL SETTING LISTING SERVES N v�i
<br /> WATTS LFMMV 110'F ASSE 1017,1069,1070 CHEMICAL SYSTEM MIXING o �
<br /> HEATING & AIR-CONDITIONING SPECIFICATIONS, PLEASE CONSULT THE McDONALD'S AREA CONSTRUCTION �,
<br /> MANAGER FOR SCOPE OF WORK. WATTS LFMMV 104'F ASSE 1017,1069,1070 LAVS & HAND SINKS MIXING j
<br /> ROOFTOP UNITS, INTAKE AND RELIEF MC MC 1-5, 17, 22 ZURN ZW3870XLT 104'F �
<br /> ROOF CURBS MC MC 1-3, 20, 22 4. ALL ROOFTOP UNIT EQUIPMENT SUPPLIED BY THE MECHANICAL CONTRACTOR NIBCO 585-70-HC - - CHEMICAL SYSTEM SHUT-OFF
<br /> GAS PIPING AND GAS PIPE KIT PC PC PC 1-3, 14, 22-23 AND THE KITCHEN EQUIPMENT SUPPLIER SHALL BE ON SITE AT THE SAME NIBCO S-FP-600A-LF - - RESTROOM SHUT-OFF
<br /> CONTROLS WIRING MC EC EC 1-3, 19, 22, 24 TIME FOR A SINGLE CRANE �IFT. EQUIPMENT SITE ARRIVAL DATE SHALL BE
<br /> POWER WIRING EC EC EC 1-3, 19, 22, 24 COORDINATED BETWEEN THE AREA CONSTRUCTION MANAGER, MECHANICAL P L U M B I N G F I XT U R E S C H E D U L E
<br /> CONDENSATE TRAP MC PC 1-3, 22-23 CONTRACTOR AND KITCHEN EQUIPMENT SUPPLIER.
<br /> CONDENSATE PIPING (IF APPLICABLE) PC PC 1-3, 22-23 � TAG DESCRIPTION MANUFACTURER MODEL WATER USE ACCESSORIES/COMMENTS
<br /> DUCT-MOUNTED SMOKE DETECTOR MC MC EC 1-3, 22, 24 5. ALL ROOFTOP UNITS INSTALLED IN McDONALD S RESTAURANTS SHALL BE HIGH
<br /> EFFICIENCY EQUIPMENT. THE INSTALLATION OF STANDARD EFFICIENCY TOTO TEL101-D10E#CP 1.0 GPM FAUCET OPERATION: SENSOR
<br /> GENERAL EXHAUST SYSTEMS ROOFTOP UNITS IS PROHIBITED. F-1 FAUCET FOR LAV-1 ZURN Z6950-XL-S-IOS-LL 0.17 GAL/1
<br /> EXHAUST FANS MC MC 1-3, 17, 22 SEC CYCLE) Q , , , , ,
<br /> ROOF CURBS MC MC 1-3, 22 6. ALL KITCHEN EQUIPMENT REQUIRING EXHAUST SHALL BE INSTALLED IN ZURN Z843M4 FAUCET OPERATION: MANUAL 5' VINYL HOSE �
<br /> CONTROLS WHERE APPLICABLE MC EC EC 1-3, 22, 24 ACCORDANCE WITH THESE PLANS. ANY VARIATION FROM THESE PLANS SHALL F-2 FAUCET FOR MS-1
<br /> � ) SEE DETAIL 2 ON DRAWING P3.0 WALL HOOK
<br /> BE REPORTED TO THE AREA CONSTRUCTION MANAGER AND THE o � � � � �
<br /> POWER WIRING EC EC EC 1-3, 22, 24 ENGINEER-OF-RECORD. ZURN Z415-SZ PIPE SIZE: 3" FUNNEL: NONE Z
<br /> TEMPERATURE CONTROLS FD-2 6x6 FLOOR DRAIN ,1AY R. SMITH 2O05 STRAINER SIZE: 6" NICKEL BRONZE SEE NOTE 8
<br /> THERMOSTATS & SUBBASES MC MC EC 1-3, 22, 24 7. WHERE GYPSUM BOARD CEILINGS ARE INSTALLED, THE MECHANICAL KOHLER K-2882-0 FAUCET: F-1 SEE NOTE 10 SEAL
<br /> REMOTE SENSORS (RH AND/OR TEMPERATURE) MC MC EC 1-3, 22, 24 CONTRACTOR SHALL SUPPLY DRYWALL MOUNTING FRAMES FOR LAY-IN TYPE �,qV-1 LAVATORY TRUEBRO LAVGUARD2 MODEL #102-E-Z SEE DETAIL 1 ON P3.0
<br /> DIFFUSERS AND FACE-ACCESSIBLE VOLUME DAMPERS TO FACILITATE AIR
<br /> CONTROLS WIRING (WHERE APPLICABLE) MC EC EC 1-3, 22, 24 CORIAN COUNTER BY G.C. � ,�
<br /> POWER WIRING EC EC EC 1-3, 22, 24 BALANCING. FAUCET• F-2 p��F � �A����
<br /> ZURN Z1996-24-HH-WG � �
<br /> DUCTWORK AND ACCESSORIES 8. NOT USED. MS-1 MOP SINK INCLUDES HOSE, HOSE BRACKET AND TWO (2) 24"Wx36"H WALL GUARDS ,��'� , ���`�'
<br /> GALVANIZED SHEET METAL DUCTWORK MC MC 1-3, 22 SEE DETAIL 2 ON P3.0
<br /> 9. NOT USED.
<br /> EXTERNAL INSULATION MC MC 1-3, 22 TOTO UT445U#01 FLUSH VALVE: TOTO TEU 1 UA12#CP FLUSH VALVE OPERATION: SENSOR ,� �,
<br /> INTERNAL INSULATION (IF APPLICABLE) MC MC 1-3, 22 UR-1 ADA WALL-HUNG URINAL ZURN Z5755 0.5 GPF ZURN ZTR6203-ULF-LL SEE NOTE 2
<br /> WEATHERPROOFING IF APPLICABLE MC MC �_3 22 10. THE BEVERAGE SYSTEM INSTALLER FURNISHES, RUNS AND CONNECTS ALL _ _ 3/4" I.P.S., 1" TOP SPUD ��� ������� �'�
<br /> S PIN-IN COLLARS ( > MC M C 1-3, 2 2 THE IBOLLOW NG AND SYRUP LINES FOR ALL AFFECTED EQUIPMENT INCLUDING TOTO CT705EN#01 FLUSH VA�VE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR ��S�aA�L'����
<br /> FLEXIBLE DUCTWORK MC MC 1-3, 22 A. HOT CHOCOL4TE WC-1 WATER CLOSET ZURN Z5655 1.28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 2155CT
<br /> VOLUME/BALANCING DAMPERS MC MC �-3, 22 B. COFFEE BREWER _ _ 1" I.P.S., 1Y2" TOP SPUD �x�� �S r� S �
<br /> C. ICE MACHINE '"'�
<br /> FIRE DAMPERS (IF APPLICABLE) MC MC 1-3, 22 D. O.J. TOTO CT705ELN#01 FLUSH VALVE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR sjro rA
<br /> FIRESTOPPING (IF APPLICABLE) MC MC 1-3, 22 E. SODA TOWERS WC-2 ADA WATER CLOSET ZURN Z5665 1.28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 2155CT
<br /> AIR DEVICES AND ACCESSORIES MC MC MC 1-3, 7, 22, 28 _ _ 1" I.P.S., 11�Z" TOP SPUD
<br /> PLUMBING SYSTEMS 11. ALL WATER HEATERS INSTALLED IN McDONALD'S RESTAURANTS SHALL BE HIGH NOTES• TO ORDER PLUMBING FIXTURES, �� �
<br /> EFFICIENCY SEALED-COMBUSTION WATER HEATERS. THE INSTALLATION OF � CONTACT HD SUPPLY: �'�' a � N
<br /> WATER HEATERS PC PC PC 1-3, 1 1-12, 23 STANDARD EFFICIENCY GRAVITY-VENTED WATER HEATERS IS PROHIBITED. �• SEE McDONALD S PROJECT MANUAL FOR ADDITIONAL MANUFACTURERS Z o-�- � „
<br /> HOT AND COLD WATER PIPE PC PC PC 1-3, 23 2. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER URINAL SUPPORT PHONE: (866) 310-3576 p �,,a�,� C o 0
<br /> VENTS AND INTAKES PC PC PC 1-3, 23 E-M A I L: M C D C O O R D O H D S U P P L Y.C O M � � a�� _�� ,��
<br /> 12. THE AREA CONSTRUCTION MANAGER, PLUMBING CONTRACTOR AND KITCHEN 3. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE INTERIOR BLOCKING ON W/W BUILDING FOR WALL CLAMP a u� ` � o o, ,.,� a
<br /> T H E R M O S T A T I C M I X I N G V A L V E P C P C P C 1-3, 2 3 EQUIPMENT SUPPLIER SHALL COORDINATE WHICH 3-COMPARTMENT SINK IS 4. Y A R D H Y D R A N T I S F O R T R A S H C O R R A L - S E E S I T E PLAN FOR LOCATION � LL � ;��� N s � �
<br /> POWER AND CONTROL WIRING EC EC EC 1-3, 23-24 BEING INSTALLED IN THE RESTAURANT. NOTE: THE INSTALLATION OF A 5. PLUMBING CONTRACTOR SHALL ROUTE N�" DRAIN PIPE FROM HOSE BIBB TO NEAREST FLOOR DRAIN OR FLOOR SINK � L � � � �°3 � o
<br /> POWERSOAK SINK REQUIRES A LARGER WATER HEATER THAN THE STANDARD 6. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER SINK SUPPORT v �'� o°•�s,� C �
<br /> KITCHEN EXHAUST SYSTEMS 3-COMPARTMENT SINK. 7. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION - PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION WITH K.E.S. :�'-'� �� ,,` ° � :�
<br /> McDONALD'S BACKSHELF EXHAUST HOODS KES KEI 1-3, 6, 22, 27 8. PLUMBING CONTRACTOR SHALL SPECIFY CONNECTION MATERIAL/TYPE WHEN ORDERING � ' � °' , °'� = o
<br /> CANOPY EXHAUST HOODS (IF APPLICABLE) KES KEI 1-3, 6, 22, 27 13. ALL GAS PIPING FOR COOKING EQUIPMENT SHALL TERMINATE IN THE CEILING 9. PLUMBING CONTRACTOR SHALL SPECIFY BURY DEPTH WHEN ORDERING `�$�� o �v� � w
<br /> BLACK IRON DUCTWORK KES KEI 1-3, 6, 22 PRIOR TO THE INSTALLATION OF THE PIPING CHASEo UPON INSTALLATION OF 10. PLUMBING CONTRACTOR SHAL� PROVIDE GRID DRAIN, P-TRAP AND VALVE STOPS FOR ALL SINKS & LAVS
<br /> STAINLESS STEEL DUCTWORK (IF APPLICABLE) KES KEI 1-3, 6, 22 THE CHASE, THE GAS PIPING SHALL THEN BE CONTINUED IN THE CHASE FOR v � o Y
<br /> ALUMINUM DUCTWORK (IF APPLICABLE) KES KE� 1-3, 6, 22 FINAL CONNECTION TO THE APPLIANCE. � n; 00„ �, o 0
<br /> N N � o � �
<br /> UL LISTED DUCT WRAP MC MC 1-3, 6, 22 14. ALL GAS PIPING FOR ROOFTOP EQUIPMENT SHALL BE BROUGHT UP THROUGH m Z -� ; W a
<br /> FIRE-RATED DUCT ENCLOSURE (IF APPLICABLE) GC GC 1-3, 6, 20, 22 PIPE PORTALS ON ROOF. ■ v o s „d ; �_
<br /> EXHAUST FANS MC MC 1-3, 6, 17, 22 H �Y � 3 G v
<br /> ROOF CURBS MC MC 1-3, 6, 20, 22 15. FIRE SPRINKLER DRAWINGS SHALL BE DESIGNED AND PERMITTED BY A FIRE
<br /> � � " 10 � av
<br /> O o'oN � � W
<br /> P R O T E C T I O N C O N T RACTOR OR LICENSED FIRE PROTECTION ENGINEER. v� � � � � _�
<br /> CURB EXTENSIONS MC MC 1-3, 6, 22 � Z L � 3 � v
<br /> CONTROLS (WHERE APPLICABLE) EC EC EC 1-3, 6, 22, 24 16. ALL R-102 WET CHEMICAL FIRE SUPPRESSION SYSTEMS FOR T Y P E I H O O D S � 0°o � � W
<br /> P O W E R W I R I N G E C E C E C 1-3, 6, 2 2, 2 4 SHALL BE DESIGNED AND INSTALLED BY A LOCAL ANSUL AGENT. THE USE � u`n,i N� o Z
<br /> FIRE SUPPRESSION SYSTEM KES KES KES 1-3, 16, 22, 27 OF DRY CHEMICAL SYSTEMS IS PROHIBITED. THE LOCAL ANSUL AGENT � M = -
<br /> KITCHEN EQUIPMENT CONTRACT IS HAND�ED THROUGH THE KITCHEN EQUIPMENT SUPPLIER.
<br /> COOLER/FREEZER KES GC 1-3, 27 17. WHERE POSSIBLE, ALL ROOFTOP UNITS AND EXHAUST FANS ARE SUPPLIED
<br /> EVAPORATOR COILS KES MC �-3° 2� WITH A FACTORY-INSTALLED DISCONNECT SWITCH. �
<br /> CONDENSATE PIPING PC PC PC 1-3, 23, 27
<br /> REMOTE CONDENSING UNIT (MAC) KES MC 1-3, 22, 27 18. ELECTRICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES FOR REMOTE � '
<br /> ROOF CURBS MC MC 1-3, 22 CONDENSING UNITS.
<br /> REFRIGERANT PIPING KES MC MC 1-3, 22, 27 �
<br /> POWER WIRING EC EC EC 1-3, 22, 24, 27 19. ALL ELECTRICAL CONDUITS FOR ROOFTOP EQUIPMENT SHALL BE BROUGHT UP Q
<br /> THROUGH PIPE PORTALS ON ROOF. >
<br /> CONTROL WIRING EC EC EC 1-3, 24, 27 >
<br /> PIPE PORTALS MC MC �-3� 22 20. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. � -
<br /> ICE MACHINES KES KEI 1-3, 27 �
<br /> WATER SUPPLY PIPING KES KEI BSI 1-3, 27 21. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. w
<br /> �
<br /> w
<br /> REMOTE CONDENSING UNITS KES MC 1-3� 22, 2� 22, SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. �
<br /> ROOF CURBS MC MC 1-3, 22, 27 w
<br /> REFRIGERANT PIPING KES MC MC 1-3, 22, 27 23. SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
<br /> POWER WIRING EC EC EC 1-3, 22, 24, 27 0
<br /> CONTROL WIRING KES EC EC 1-3, 24, 27 24. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. � �
<br /> a
<br /> PIPE PORTALS MC MC 1-3, 22 g
<br /> GRILLS KES KES 1-3, 27
<br /> 25. SEE FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION. o
<br /> GAS PIPING (IF APPLICABLE) PC PC PC 1-3, 23, 27 26. SEE FIRE ALARM DRAWINGS FOR ADDITIONAL INFORMATION. ?
<br /> POWER WIRING EC EC EC 1-3, 24, 27 G
<br /> CONTROL CABLE (6' CLAMSHELL ONLY) MC EC EC 1-3, 23, 240 27 27. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION. �
<br /> 0
<br /> FRYERS KES KES �-3' 2� 28. SEE DECOR DRAWINGS FOR ADDITIONAL INFORMATION. °-
<br /> GAS PIPING (IF APPLICABLE) PC PC PC 1-3, 23, 27
<br /> POWER WIRING EC EC EC 1-3, 24, 27
<br /> 3-COMPARTMENT SINK KES KES 1-3, 12, 27
<br /> FAUCETS AND PRE-RINSE SPRAYER KES KES 1-3, 27
<br /> WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 •
<br /> SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 W �
<br /> HAND SINKS PC PC 1-3, 23, 27 Q
<br /> FAUCEf PC PC 1-3, 23, 27 N cn }
<br /> WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 J � m
<br /> SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 � � O
<br /> VEGETABLE SINK KES KES 1-3, 23, 27 p � U
<br /> FAUCET KES KES 1-3, 23, 27 = � �
<br /> U
<br /> WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 N � p�
<br /> SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27
<br /> WASHING MACHINE KES KES 1-3, 23, 27
<br /> � N � �
<br /> � WATER SUPPLY PIPING PC PC PC - , o � o cn �
<br /> � SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27 � I
<br /> a WARE WASHER KES KES 1-3, 23, 27 � � m `
<br /> rn WATER SUPPLY PIPING PC PC PC 1-3, 23, 27 Z � N �
<br /> M
<br /> N SANITARY DRAIN PIPING PC PC PC 1-3, 23, 27
<br /> W O
<br /> � Z �
<br /> v MISCELLANEOUS ITEMS
<br /> o FIRE SPINKLER SYSTEMS FPC FPC FPC 1-3, 15, 25 a � �
<br /> 0
<br /> N HVAC EQUIPMENT START-UP TAB 1-3, 22 � •• c~n O
<br /> � TEST, ADJUST AND BALANCE HVAC SYSTEMS TAB 1-3, 22 W Z � m Q �
<br /> � DOOR GRILLES (IF APPLICABLE) MC GC 1-3, 20, 22 N � N m o 0
<br /> � ROOF/WALL OPENINGS GC 1-3, 20-24 w � z w Q
<br /> a APPLIANCE BACKFLOW PREVENTION KES/BSI PC PC 1-3, 23, 27 0 � Q � z
<br /> � CO2 DETECTION SYSTEM MC EC EC 1-3, 22, 27 a o o �
<br /> � -
<br /> � SHEET NUMBER `
<br /> � "_'_ _
<br /> �
<br /> rn
<br /> 3
<br /> ° 4 . 1 =-
<br /> 0
<br /> o . .
<br /> � � .
<br /> _
<br />
|