Laserfiche WebLink
Criteria for Selection (70 Points Maximum) <br />1. Describe the structure of the consultant team and all subconsultant(s) with contact <br />information and a description of each company. Include a summary of each team member's <br />qualifications, experience, and role on the project. (10 points) <br />2. The City of Everett requires an experienced project manager capable of sharing <br />management responsibilities with the City and providing direction, scheduling, and <br />oversight for multidisciplinary federally funded projects If a consultant is selected for the <br />project, the project manager identified in the submittal must act as the primary point of <br />contact throughout the duration of the contract, unless a suitable replacement is approved <br />by the City. <br />a. Describe the project manager's experience supervising projects similar in scope and <br />nature. (10 points) <br />b. Explain how the project manager will maintain communication with the City, <br />project team members, subconsultants, and other relevant stakeholders. (5 points) <br />c. Describe the tools, techniques, and project management software that the project <br />manager uses to ensure tasks are assigned, completed on schedule, and <br />communicated to all team members. (5 points) <br />3. Include a list of projects, similar in scope and nature, completed by the consultant team in <br />the last seven (7) years. For one or more of the projects, include the following details. <br />a. Project name, date, and a brief description of the project, including contact name <br />and information for both the agency owner and contractor. (5 points) <br />b. Comparison of the engineer's cost estimate, bid award, and final construction cost <br />with an explanation of any differences. (5 points) <br />c. Design and project management costs as a percentage of construction cost. (5 <br />points) <br />4. Describe the level of effort, potential issues, and impacts involved with this project and <br />those similar in scope and nature. Include in the description an estimated project schedule. <br />(10 points) <br />5. Provide no more than (3) letters of recommendation from previous clients with projects <br />similar in scope and nature. (10 points) <br />6. Explain how the consultant team plans to meet the project's mandatory UDBE goal of eight <br />(8) percent and provide supporting contact information of the proposed UDBE(s). (3 points) <br />7. Identify the location of the design team's project office. Preference will be given to offices <br />closest to the City's Public Works Department. (2 points) <br />Statements shall be limited to twenty (20) 8.5" x 11" size pages, excluding the title page, cover <br />letter, and no more than three (3) letters of recommendation from previous clients. No additional <br />information or pamphlets will be considered. <br />AMERICANS WITH DISABILITIES ACT (ADA) INFORMATION <br />The City of Everett in accordance with Section 504 of the Rehabilitation Act (Section 504) and the <br />4 of 5 <br />