My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3774-20
>
Ordinances
>
Ordinance 3774-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 11:39:11 AM
Creation date
11/16/2020 11:30:41 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3774-20
Date
11/4/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
utility extensions or for the construction of a bulkhead or other measures to protect a single-family <br /> residence and its appurtenant structures from shoreline erosion.See the definitions section of the <br /> city's shoreline master program for the definition of a limited utility extension; <br /> c. Mailing notice to the latest recorded real property owners as shown by the records of the county <br /> assessor within at least five hundred feet(500')of the boundary of the property upon which the <br /> development is proposed; <br /> d. Mailing notice to the SEPA mailing list(unless the project is categorically exempt);and <br /> e. Mailing notice to the neighborhood leader mailing list if applicable. <br /> 6. If the planning director determines that the land use decision should be heard by the hearing examiner <br /> due to potential project impacts or public concerns,the planning director may require the permit <br /> application to be reviewed using Review Process III(hearing examiner). <br /> 15.02.070 Review Process II: Planning director Review. <br /> A. Description <br /> Review Process II("REV II")applies to permit applications that involve a greater exercise of administrative <br /> discretion by the planning director. No public hearing is required for REV II applications.Public notice <br /> requirements are specified in subsection C below and EMC 15.02.100-110. <br /> B. REV II decisions included <br /> The following permit applications are included as REV II decisions: <br /> 1. Uses. The following uses identified in EMC 19.05 are REV II decisions: <br /> a. Land use decisions identified as"Administrative Uses",or"A"in EMC 19.05.080-.120,Tables 5-1 <br /> through 5-5); <br /> b. Use of basement or other building spaces in the Mixed Urban Zone(EMC 19.05.040); <br /> c. Modification of special regulations and notes in Tables 5-1 through 5-5(EMC 19.05); <br /> d. Minor expansion of a Conditional Use(EMC 15.03.120.C.4); <br /> e. Specific Uses(see EMC 19.13 for uses that are subject to REV II review); <br /> f. Other uses shown in the special regulations and notes in Tables 5-1 through 5-5 in EMC 19.05 <br /> requiring a REV II decision. <br /> 2. Modification of development standards.The following modification of development standards allowed by <br /> this title are included as REV II decisions: <br /> a. Accessory Dwelling Units(EMC 19.08.100) <br /> b. Modification of lot width requirements or on-site open space standards(EMC 19.08) <br /> c. Modification of Specific Use standards(EMC 19.13) <br /> d. Modification of structured parking standards(EMC 19.12.110) <br /> 3. Nonconforming. Expansion of a nonconforming use greater than 10%but less than or equal to 25%of <br /> land or building area.(EMC 19.38) <br /> 4. Building Heights.The following modification of building heights are included as REV II decisions: <br /> a. Amateur radio tower or antenna exceeding 65'above base elevation (EMC 19.22.090) <br /> b. How heights are measured(EMC 19.22.060) <br /> 5. Historic.The following permit applications are included as REV II decisions: <br /> a. Demolition of a building identified as a contributing structure within an Everett historic overlay zone <br /> or on the Everett Register of Historic Places,provided,however,that demolition of a building on the <br /> Everett Register of Historic Places shall be authorized by city council; <br /> b. Construction of any new building with three or more dwelling units if within an historic overlay zone; <br /> c. Construction of a new clinic,commercial building,or places of worship;or <br /> d. Deviations from Historic Overlay Zone standards and neighborhood conservation guidelines. <br /> 6. Off-street Parking.The following modification of off-street parking standards allowed by this title are <br /> included as REV II decisions: <br /> Ch.15.02 Local Project Review 6 City Council Action(11/04/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.