Laserfiche WebLink
a. Modification of off-street parking set forth in Table 34-1 or 34-2 greater than 25%(EMC 19.34.060) <br /> b. Modification of off-street parking location standards(EMC 19.34.100) <br /> 7. Critical areas. Development of previously altered critical areas which were unauthorized,and when the <br /> proposal is not categorically exempt under SEPA.(EMC 19.37.250.6) <br /> 8. Shorelines.The following shoreline permit applications are included as REV II decisions: <br /> a. The development will include new construction or additions to buildings within 200 feet of the <br /> ordinary high water mark which are in excess of 35 feet in height;or <br /> b. The development will include the construction of docks or other in-water facilities,including fill, <br /> which could interfere with the public's use of shorelines of the state. <br /> 9. Land Divisions.Land division applications which meet the following are included as REV II decisions: <br /> a. Unit Lot Land Divisions(EMC 19.27) <br /> b. Divisions of land into ten lots, but no more than fifty(50)lots by subdivision or binding site plan (EMC <br /> 19.24). <br /> c. Reduction in lot depth(EMC 19.06.080). <br /> d. Exception to the lot area, lot width, lot depth and setback standards for a division of land with more <br /> than one existing single-family dwelling on one lot.(EMC 19.06.080) <br /> 10. SEPA. If a Review Process I application is not categorically exempt under SEPA,the application shall be <br /> processed under Review Process II <br /> 11. Any permit application identified in this title as a Review Process II (REV II)decision. <br /> C. Public notice requirements <br /> Public notice of REV II decisions shall include notice of application and notice of decision. <br /> 1. General Requirements. Public notice of the notice of application shall be provided by: <br /> a. Posting notice on or near the property with two signs no less than twenty-four inches by thirty-six <br /> inches in size,as specified by EMC 15.02.110; <br /> b. Posting additional signs if the project is a linear project,as specified by EMC 15.02.110; <br /> c. Mailing notice to owners of property located within one hundred fifty feet(150')of the subject <br /> property, provided,however,that shoreline project permit applications shall be mailed to property <br /> owners within five hundred feet(500')of the boundary of the property upon which the development <br /> is proposed; <br /> d. Mailing notice to the SEPA mailing list(unless the project is categorically exempt); and <br /> e. Mailing notice to the neighborhood leader mailing list if applicable. <br /> 2. Specific Land Use Notice Requirements. In addition to the general requirements outlined above,the <br /> following notices are required as set forth below: <br /> a. Land Divisions. <br /> i. Right to Hearing. Pursuant to RCW 58.17.095,any REV II preliminary plat application shall include <br /> a mailed notice which includes a statement that an open public hearing(REV III)shall be held if <br /> any person files a request within twenty-one(21)days of publishing the notice. <br /> ii. State Highways.Pursuant to RCW 58.17.155,whenever the city receives an application for a <br /> short subdivision which is located adjacent to state highway right-of-way,the city shall give <br /> written notice of the application to the Washington State Department of Transportation. <br /> iii. Adiacent City. Pursuant to RCW 58.17.080, notice of the filing of a preliminary plat of a proposed <br /> subdivision adjacent to or within one mile of the municipal boundaries of a city or town,or which <br /> contemplates the use of any city or town utilities shall be given to the appropriate city or town <br /> authorities. <br /> iv. Airport. Pursuant to RCW 58.17.080,notice of the filing of a preliminary plat of a proposed <br /> subdivision located within two miles of the boundary of a state or municipal airport shall be <br /> given to the secretary of transportation and to the airport manager. <br /> Ch.15.02 Local Project Review 7 City Council Action(11/04/2020) <br />