Laserfiche WebLink
Instructions to reader:This is a new chapter in the Unified Development Code. This chapter has been recodified <br /> from EMC 18.36.For a summary of the effect of the changes,please visit the Rethink Zoning Library at <br /> https://everettwa.gov/2453/Rethink-Zoning-Library. <br /> Chapter 19.50 SMALL PROJECT IMPACT FEE <br /> Table of Contents <br /> CHAPTER 19.50 SMALL PROJECT IMPACT FEE 1 <br /> 19.50.010 TITLE,AUTHORITY,AND PURPOSE. 1 <br /> 19.50.020 LOCATION OF DEFINITIONS AND USAGE 1 <br /> 19.50.030 WHEN A TRANSPORTATION IMPACT FEE IS REQUIRED 1 <br /> 19.50.040 CREDIT FOR IMPROVEMENTS AND NONDUPLICATION OF MITIGATION 1 <br /> 19.50.050 OPTION TO PREPARE TRAFFIC ANALYSIS 2 <br /> 19.50.060 ADMINISTRATIVE PROCEDURES AND APPEALS 2 <br /> 19.50.065 FEE EXEMPTIONS 4 <br /> 19.50.070 APPLICATION TO PROJECTS CURRENTLY UNDERWAY 4 <br /> 19.50.080 PROJECTS IN CORE AREA. 4 <br /> 19.50.090 INTERPRETATION AND IMPLEMENTATION. 5 <br /> 19.50.010 Title, authority, and purpose. <br /> A. Title.The ordinance codified in this chapter may be referred to or cited as the small project impact fee <br /> ordinance,or"SPIFO,"and will be referred to herein as"this chapter." <br /> B. Purpose and Authorization.The purpose of this chapter is to implement the city's comprehensive plan <br /> including its transportation and capital facility elements.This chapter enables the city to collect impact fees <br /> from proposed projects that generate additional traffic and are not subject to the city's transportation <br /> mitigation ordinance(TMO)(Chapter 19.51).The fees adopted under this chapter are authorized by and in <br /> accordance with the provisions of RCW 82.02.050 through 82.02.090. <br /> 19.50.020 Location of definitions and usage. <br /> This chapter adopts by reference the definitions contained in RCW 82.02.090. For terms not defined therein,this <br /> chapter adopted by reference the definitions and used contained in Section 19.51.180. <br /> 19.50.030 When a transportation impact fee is required. <br /> A project that is not subject to TMO and will generate ten or more average daily vehicle trips is required to pay a <br /> transportation impact fee as defined in Section 19.51.100(D),except as otherwise provided in this chapter.The fee <br /> assessed under this chapter is and shall be based on a method of calculation that takes into account the factors <br /> specified by RCW 82.02.060.There shall be one service area for purposes of this chapter; however,within the core <br /> area as defined in Section 19.51.180 trip generation shall be calculated as provided in Section 19.50.080. <br /> 19.50.040 Credit for improvements and nonduplication of mitigation. <br /> A. A person required to pay an impact fee for system improvements under this chapter shall not be required to <br /> pay a fee under RCW 43.21C.060,TMO,or any other development regulation for those same system <br /> improvements. <br /> B. The city traffic engineer shall take into consideration and give fair credit for an applicant's contribution to <br /> transportation system improvements for facilities identified in the capital facilities plan that address some or <br /> all of a proposed project's approval related to the proposed project.The city traffic engineer shall also take <br /> Ch.19.50 Small Project Impact Fee 1 City Council Action(11/04/2020) <br />