My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3774-20
>
Ordinances
>
Ordinance 3774-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 11:39:11 AM
Creation date
11/16/2020 11:30:41 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3774-20
Date
11/4/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Number of Trips Level of Service at <br /> Generated Horizon Year Fee Calculation <br /> *For proposed projects in core area,trip calculation at 75% <br /> of ITE Trip Generation Manual or as justified in a traffic <br /> analysis <br /> 19.51.100 Fair share for system improvements. <br /> A. Two Components of Fair Share.This section specifies the mitigation for transportation system improvements, <br /> unless otherwise agreed by the city traffic engineer.The fair share shall consist of two components: <br /> 1. A fee for each peak hour trip calculated to provide a fair share,attributed to new development,of the <br /> cost of"planned system improvements"(see subsection D of this section for fee amount); plus <br /> 2. Responsibility for a fair share of cost of additional improvements, if any,to maintain acceptable levels of <br /> service as a result of the proposed project(see Table 2 and subsection B of this section for method of <br /> calculating the fair share). <br /> When level of service"D"or better will be met at the horizon year with the project,the applicant shall not <br /> be required to pay a fair share contribution for additional transportation system improvements.This <br /> section does not duplicate,replace,or substitute for any local transportation improvements for which an <br /> applicant is responsible. <br /> B. Fair Share Cost of Additional Improvements. Based on the actual traffic projected to be generated by a project <br /> onto the transportation system and the consequent need to make system improvements to maintain <br /> acceptable levels of service and address the impacts resulting from the project,the project's fair share cost to <br /> the city for the any transportation system improvements—in addition to the applicant's fair share of planned <br /> system improvements—shall be determined by the following(inclusion of county,state,and/or other city <br /> facilities shall be required when the city traffic engineer deems it appropriate): <br /> 1. Where the need for transportation system improvements to mitigate a project's impacts would not be <br /> required at the horizon year if the development were not constructed,the cost for the system <br /> improvements will be entirely borne by the project. <br /> 2. Where the need to provide transportation system improvements to mitigate a project's impacts by the <br /> horizon year would be required regardless of the proposed project, but the project will increase the traffic <br /> and add to the need for improvements now or in the future,and: <br /> a. The current level of service is"D"or better,the traffic impacts of the project will be considered <br /> mitigated by a contribution of a share of the costs for the improvements based on the project's <br /> percentage of the total peak hour traffic trips at the horizon year on the facility to be improved less <br /> existing peak hour traffic volume;or <br /> b. The current level of service is"E"or"F,"the traffic impacts of the project will be considered mitigated <br /> by a contribution of a share of the costs for the improvements based on the project's percentage of <br /> the total peak hour traffic trips at the horizon year on the facility to be improved. <br /> C. Generally, an applicant should expect to pay the fair share fee in accordance with the formula in this section <br /> along with any local improvements that may be needed. Further explanation on whether improvements or <br /> fees in fact address all or part of a project's local and systemwide impacts can be found in Sections <br /> 19.51.080(G), 19.51.090(A)and(B),and 19.51.120, and associated definitions in Section 19.51.180. <br /> D. Traffic Mitigation Fee.The current traffic mitigation fee rate shall be calculated as follows and published in the <br /> city of Everett's standards and specifications manual section on traffic impact analysis.The initial traffic <br /> mitigation fee at the implementation of the ordinance codified in this chapter shall be two thousand four <br /> hundred dollars per PM peak hour trip.This rate shall be adjusted annually to account for inflation based on <br /> the official Washington State Department of Transportation(WSDOT)Construction Cost Index(CCI), using the <br /> year of implementation of the ordinance codified in this chapter as the base year. <br /> Ch.19.51 Transportation Mitigation 7 City Council Action(11/04/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.