Interwest Construction Inc. 11/9/2020 Amendment 25
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 11/9/2020 Amendment 25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 1:02:27 PM
Creation date
11/16/2020 1:02:17 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
11/9/2020
Council Approval Date
10/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Amendment
Amendment/Change Order Number
25
Tracking Number
0000801
Total Compensation
$560,015.61
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 25 <br /> Change Order Effective Date: 9-29-2020 <br /> Justification <br /> Existing Bid Item #A-43—Ductile Iron Pipe for Storm Sewer,36-Inch Diameter Class 53 <br /> Existing Bid Item #A-77—30-Inch Diameter Flexible Coupling(Single Ball with Exp). <br /> Existing Bid Item #A-92—Steel Reinforcing Bar-Utility Bridge. <br /> Existing Bid Item #A-171 —Shoring or Extra Excavation Class B. <br /> All four(4) existing bid items above overran plan quantity. Quantities are being increased to <br /> account for actual quantities on these bid items. Working Days impacted: 0. <br /> New Item #A-326—Third Party Damage: Fisherman's Harbor Apartment Fire. The night of the <br /> apartment fire at the Port of Everett,just to the NW of the bridge, a significant amount of ash and <br /> debris was deposited in the footprint of the bridge project that required cleanup work. This new item is <br /> being created to account for costs to pay for the fire cleanup. Working Days impacted: 0. <br /> New Item #A-327—Fence Replacement. This new item is being created to pay for costs to replace a <br /> damaged fence adjacent to Grand Avenue Park that was damaged due to work on this project. <br /> Working Days impacted: 2. <br /> New Item #A-328—Grade and Drainage Modifications at Grand Avenue Park. A storm drain <br /> installed per approved design in the park concrete didn't drain properly, so the contractor removed and <br /> replaced the drain and installed some additional concrete. This new item is being created to account <br /> for costs to pay for this additional work. Working Days impacted: 2. <br /> New Item #A-329—Structure Excavation Class B Including Haul,Increased Quantities Cost. <br /> Replaces the portion above 125% of plan quantity from bid item #A-25. <br /> New Item #A-330—Crushed Surfacing Base Course, Increased Quantities Cost. Replaces the <br /> portion above 125% of plan quantity from bid item #A-28. <br /> New Item #A-331—Topsoil, Increased Quantities Cost. Replaces the portion above 125% of <br /> plan quantity from bid item #A-104. <br /> All three(3) of the new items above had actual quantities of over 125% of their original bid item. <br /> The WSDOT Standard Specifications allows for each original bid item to be renegotiated to <br /> compensate the contractor for actual costs of the bid item. New items were created to pay for <br /> each of those quantities above the 125% amount. Working Days impacted: 0. <br /> New Item #A-332—Apply Anti-Graffiti Coating on Concrete Block Walls in Park, and Other <br /> Miscellaneous Additional Work. The anti-graffiti coating was additional work required but not <br /> included on the Grand Avenue Park plans and specifications but necessary in order to more readily <br /> remove graffiti from the concrete block walls in the park. Other miscellaneous work included the <br /> addition of steel bolts into the throw barrier underneath the west tower stairs to better secure the <br /> panels. The contractor also removed and transported miscellaneous City of Everett signs to the city <br /> yard. This new item is being created to account for costs to do this extra work. Working Days <br /> impacted: 0. <br /> Page 6 of 8 <br />