Interwest Construction Inc. 11/9/2020 Amendment 25
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 11/9/2020 Amendment 25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 1:02:27 PM
Creation date
11/16/2020 1:02:17 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
11/9/2020
Council Approval Date
10/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Amendment
Amendment/Change Order Number
25
Tracking Number
0000801
Total Compensation
$560,015.61
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 25 <br /> Change Order Effective Date: 9-29-2020 <br /> New Item #B-113—Additional Miscellaneous Steel. The bridge drains as designed drained directly <br /> into steel beams below the bridge deck, so the contractor added miscellaneous steel and redirected the <br /> drains so that the bridge would drain properly. This item is being created to account for costs to <br /> implement these revisions. Working Days impacted: 4. <br /> New Item #B-114—West Landing Drainage Revisions. The contractor installed additional 4-inch <br /> and 6-inch drainage pipes which meandered over and under sewer piping, electrical facilities, and steel. <br /> truss members in order to avoid conflicts with them. This new item is being created to account for <br /> costs to implement these revisions. Working Days impacted: 6. <br /> New Item # B-115—Concrete Mounted Handrail,West Abutment Tower. The approved plans did <br /> not show installation details for connecting the stainless steel handrail to the concrete abutment. The <br /> contractor added mechanical hardware and an epoxy-set anchoring system to accomplish this work. <br /> This new item is being created to account for costs related to this additional work. Working Days <br /> impacted: 2. <br /> New Item #B-116—Throw Barrier Cap Channel Modifications. The top cap channels did not <br /> match up in some of the transition areas of the bridge and at corners where it is critical that they match <br /> evenly where they meet. This new item is being created to account for costs to make steel <br /> modifications both in the shop and in the field. Working Days impacted: 2.5. <br /> New Item #B-117—East Stairs ADA Adjustments. Greater than anticipated static bridge span <br /> deflection resulted in the need to adjust the east stairs. This new item is created to account for costs to <br /> re-fit and adjust the east stairs so that they would remain ADA compliant. Working Days impacted: <br /> 3.5. <br /> New Item #B-118—Concrete Class 4,000-Pedestrian Upgrades,Increased Quantities Cost. <br /> New Item #B-119—Concrete Class 4,000D For Bridge,Increased Quantities Cost. <br /> Both new concrete items above had actual quantities of over 125% of their original bid item. <br /> The WSDOT Standard Specifications allows for each original bid item to be renegotiated to <br /> compensate the contractor for actual costs of the bid item. New items were created to pay for <br /> each of those quantities above the 125% amount. <br /> New Item #B-120—Bridge Lighting Modifications. One of the L03 lighting fixtures for the bridge <br /> lighting did not properly fit as designed so this item is being created to account for costs to procure and <br /> install a modified L03 lighting fixture in the space between the bridge and the outside wall of the <br /> elevator shaft. Working Days impacted: 0. <br /> New Item #B-121 —Install Bridge Bonding. In order to ensure an electrically continuous bridge <br /> structure, it was recommended that the electrical subcontractor install additional grounding, as required <br /> by the National Electrical Code, to provide a dedicated low resistance path to earth for fault currents. <br /> This new item is being created to account for costs to install bridge bonding and ensure the safety of all <br /> while crossing the bridge. Working Days impacted: 0. <br /> Page 7 of 8 <br />