My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7400 HARDESON RD 2003 Geotech Report 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
7400
>
Geotech Report
>
7400 HARDESON RD 2003 Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:36:00 PM
Creation date
11/20/2020 7:50:49 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7400
Year
2003
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />It <br />' <br />' <br />' <br />' <br />' <br />� <br />Jauuary 22,'_003 <br />HWA Projcc� No. 200?-I85 <br />loosened and soflened sc�ils. 'I'hc pipe bcdding shuuld c�tcnd up the siJcs uf thr pipcs to <br />at lcast lhc spring line, and prefcrably to G-inchcs abo��c thc lop oFpipc. l�hc heddin�� <br />should be compacted under/around the pipe and pi�x haunnc�s to cnsurc unili,rm s�µ�pui�t <br />forthe pipe. <br />If the trench spoils remain dry, lhese malerixls cun bc rcuscd as Ircnch backlill in <br />nomstructurul areas where several inches of setUcment can be tulerated. lio�cc� cr, thc <br />soils are highly moisture sensilivc and if exposcd to ground �vatcr ur sm•face ���atcr, may <br />be impossible to rewmpact. If the soils bccome too wet fi�r compaction, ��•e recununend <br />imported granular soils be used instcad. .. <br />During plucement oCthe initial litts, trench backfill m�tcrial should nut be bulldozed inlo <br />the trench or dropped direcUy on the pipe. Furthemiorc, hcu��y ��ihralory equipment <br />should noi be pennilted to operalc direcUy o��cr the pipc witil a minimum of 3 fcet of <br />backfill has been placed. <br />R'et Weather Earth��•ork <br />The silry sand surticial soils arc highly moisWre scnsiti��c and may be dillicult tu lraverse <br />with construction cyuipment during periods of wel wcathcr. Gencral recommendations <br />rclative to earthwork performcd in wet weather ��r in �ect conditions are presentcd bclow. <br />These recommendations should be incoiporated iAto thc contract spccitications. <br />C • Earthwork should be perfonned in smaU areas lo minimiu exposure to wet Ncatlier. <br />Excavation or the removal oF unsuitable soil shc�uld bc fi�llo�ved prompHy by the <br />placement nnd compaction of clean struclural till. l'he si-t.c and type of construction <br />cyuipment used may need to bc limited to prcvent soil disturhancc. <br />� <br />• Malerial used as structural fill should consisl of clean granular soil with less than 5 <br />peroent fines. Thc fines shuuld be nun-plastic. <br />• Thc ground surfacc �vithin lhc consU•uclion arca should hc maintained to promotc run- <br />off of surface water and to prevent Ihe ponding of ���.�lcr. <br />• The ground surface within thc constivction arca should be sculed by a smooth Jrum <br />viUralory rollcr, or cyuivalcnt, and undcr no circumstanccs should soil be lefi <br />unrnmpacted and cxposed to muisture. <br />• 6xcavatiun and placement of structural fill matcrial slwuld bc observed by a <br />rcprescntative uf thc gcotechnical cngincer, lo dcl�nnin� lhal lho �vurk iti bcina <br />accomplishcd in accordancc wi�h lhc projcct spccilicaliuns and thc rccomnundations <br />conlaincd hcrcin. <br />200?-IR> Suppl LR.dot <br />II\\'A GeoScicnccs Inc. <br />I <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.