Laserfiche WebLink
� ' January 22,2003 <br />, Ii1VA1'rojcctNo.2002-IRS <br />� <br />�` <br />t; <br />CONDI"1'IONS :�i�D 1.1;\II'1',\'1'IONS <br />Wc havc prcparcd this rcpurt li+r 13cny Nc�m lin� usr in dr,ign ufa purtion uf Ihis,projcct. <br />� 7'his report sliould bc pro��idcJ in its cnlircty to prospcctivc ri,ntracturs li�r hiddin�: and <br />estimating pur��oscs; howcvcr, thc conclusiuns and inlrrprct:ilions prescnlcd in lhi, rcpinY <br />shoidd nut bc conslrucd :IS �\V:11'I':mly ul�thr subsin�l;icc con�litiuns. Lxperirncr has <br />, shown th�t soil and grAUnJ watcr cundilious can �;iry si,milicantiy uvcr small distanccs. <br />Inconsislent cnnditions c;tn uccur bcl���crn cxpl�iratii,ns anil m:ry not br drtcclyd hy a <br />� <br />� <br />j <br />geotechnical study. If, during futw•e silc uperations, suhsin liicc runJitions arc <br />encountered whidf vary apprcciably t�om ihosr Je.cril,cJ hcrcin. FI�VA shoulJ bc <br />notified (or review of the recommcnJations of lhis rcpurt, anJ rreisiun i�l'such if <br />necessary. <br />Sufficient geotechnical muni(orin��, trsting, aqd consultalic�n shuuld be, procidal durin�� <br />construction to continn that thc couditions cncounlercJ arc consistcnt �vith �hasc . <br />indicated by explorations, to pro��idE, recommcnci�tions fiir design changes shuuld <br />conditions revealed during construction dilTer Irom thusr_ anticipated, anJ to ��crl'y that <br />the geotecluiical aspects of conslruction ixmiply with the amtract plans add ' <br />specifications. • '. <br />� 1 <br />• . � <br />Within the limitations of scope, schedule and budget, 11�VA attempted lo esecute these � <br />services in accordance with gener�lly accepted professiunal principles and practices in <br />tlte fields of geotechnical enginecring and enginecring gcology in the arca at the time the <br />report was prepared. No w�rranry, e�press or implieJ, is niade. 'I'he scope of our �cork <br />did not include environmcntal assesstnaris or e��aluations regarding the presence or <br />absence of weUands or hazardous substanccs in tlie se�il� SUI'�ace water, or ground water at <br />this site. <br />Tl�is firm does not practice or consult in thc ficld of salcty cngincering. We do not direct <br />U�e contractor's operations, and cannut bc responsiblc fi�r lhc safcly of personncl uther <br />than our own on thc site. As such, thc safcry of olhcrs is lhc respunsihility of lhc <br />contractoc Thc contractor should notify thc owncr if hc considcrs any of the <br />recommended actions presented hercin unsaFe. <br />2002-IRS SuppII..R.doc 10 IIN'A Gtt�Sricnceslnc. <br />�e <br />�3 <br />