My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
>
Contracts
>
Capital Contract
>
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:04 AM
Creation date
11/30/2020 10:30:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Norrthwest Inc.
Approval Date
11/23/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Watermain Replacement U
Public Works WO Number
UP3698
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002149
Total Compensation
$40,425.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Northwest Inc 12/31/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Watermain Replacement "U" <br /> Change Order No.1 <br /> Change Order Effective Date: 11-3-2020 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation,delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Appr As m: <br /> Officeoved of theto CityFor Attorney <br /> a�,�/� APPROVED AS TO FORM <br /> "' ' David C.Nail, City Attorney <br /> ayor City Clerk City Attorney <br /> Date: j/ C,`a)) c. Date://—04-3 O' Date: 2l.Q <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Jr, <br /> ,1,1( <br /> Date: 11 JQ-20�b IP ate: /0/2# l ate: (/ 2 v Date: ii-k)-20Zv <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.