My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/02 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:30:39 AM
Creation date
12/3/2020 2:48:45 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• City will provide data as identified in the Configuration Document and supporting spreadsheets. <br />City will provide to Timmons Group an updated geodatabase of all assets covered within the scope of this <br />project. <br />Phase 2, Task.5: Estimated Timeframe:. <br />• Configuration Document completion is estimated to take 4-6 weeks to complete <br />Phase 2, Task 6: Install Cityworks Server <br />Timmons Group will install the core Cityworks software in the City's development environment located on <br />the City provided Azure environment. The intent of this installation is to meet the initial Cityworks <br />implementation requirements which include initial system configuration and configuration customization. <br />We will work directly with the City's Project Manager to verify that all core system components are <br />installed and appropriately configured. Our implementation team will facilitate Cityworks software <br />installation, set-up, and initial configuration. <br />The purpose of installing this software at an early stage in the project is two -fold: It establishes the core <br />system that will later be configured and tested and is the ideal platform for familiarizing City staff with the <br />software as a sandbox for your use. This server will be linked with a copy of the City's Esri GIS <br />geodatabase. Timmons Group will generate an Installation Certification for the City to sign off signifying <br />this installation has occurred and is functioning within the City's development environment located on the <br />City provided Azure off -site environment. <br />Phase 2, Task 6: City Responsibility: <br />• Provide a copy of the City's Esri geodatabase <br />• City's GIS resource (2 FTE hours) <br />Phase 2, Task 6:' Timmons Group Responsibilities and Deliverables: <br />• The core Cityworks Server AMS software installed on the City s development environment on the City provided <br />off -site Azure environment <br />• Installation Certification for City signoff of successful installation of Cityworks software (not full configuration). <br />Phase 2, Task 6: Assumptions: <br />• The City will have a development environment to install Cityworks within, this, environment will beprovided the <br />City, on the City provided off -site Azure environment. Cityworks software to be installed by Timmons Group. <br />Phase 2, Task 6: Estimated Timeframe: <br />• The initial installation of Cityworks is estimated to require 2-3 weeks once the City's GIS data is received <br />P hase 2 Exit Criteria <br />• System Architecture Document <br />o IT System Architecture <br />• Webinar to discuss impacts to current computing environment. <br />• Core System Plan for Hardware, Software, and network configuration specifications for Cityworks in a <br />City provided off -site Azure environment <br />• Configuration document with spreadsheets initially filled out with form data supplied by the City. <br />• The core Cityworks Server AMS software installed on the City's development environment on the City <br />provided off -site Azure environment <br />• Installation Certification for City Information Technology Director signoff of successful installation of <br />Cityworks software (not full configuration). <br />P hase 3: Cityworks Base Configuration <br />P hase 3, Task 7: Initial System Design and Configuration (SD&C) Plan <br />Once all required information regarding the current work order management service request, and <br />inspection processes are collected and organized, our implementation team will work together to analyze <br />and document the current status of the primary components of the business process. Specifically, these <br />components will be analyzed: <br />17IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.