My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/02 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:30:39 AM
Creation date
12/3/2020 2:48:45 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Current IT Systems and Applications — This includes relevant computer, network, mobile <br />device requirements and peripheral infrastructure that the Cityworks system would utilize This <br />also includes any existing software applications that the new system might need information <br />from, or need to provide information to (e.g., financial assessment, codes) and security <br />requirements. <br />• Current Data Sets — Focus on data and best practices for Cityworks. Specifically, this would <br />include the work order, service request, and inspection documentation and data The Esri <br />geodatabase that will be mapped to Cityworks we expect limited if any, modification will be <br />necessary. <br />Our implementation team will develop an initial SD&C Plan based upon industry and Cityworks best <br />practices and puts forth the recommended, or `to -be" (future state), workflows of the new Cityworks <br />system. The resulting initial Software Design and Configuration (SD&C) plan will be the "floor plan" for the <br />configuration of the Cityworks system <br />Phase 3, Task 7: City Responsibility: <br />• Review of draft Initial SD&C. (4 - 8 FTE Hours Per project team member) <br />Phase 3, Task 7: Timmons Group Responsibilities and Deliverables: <br />• Initial SD&C Plan drafts <br />Phase 3, Task 7: Assumptions: <br />• City will review all documentation within 10 business days or a mutually agreed upon timeframe. <br />P hase 3, Task 7: Estimated Timeframe: <br />• The initial SD&C plan will require approximately 8-12 weeks to complete. <br />P hase 3, Task 8, GIS System Review <br />Our implementation team will meet with the City's project management team and GIS staff to discuss the <br />Esri GIS requirements for the Cityworks implementation. During this meeting, minimum GIS requirements <br />will be explored to ensure a stable implementation of Cityworks for the City. The goal is to ensure the GIS <br />is in place and that all related system and security policies are understood prior to initial software <br />configuration. In addition, the GIS Model will require review and possible modification by the City. Our <br />implementation team will work with the City to identify any shortcomings with the existing City's GIS data, <br />data model and Esri licensing. It will be the responsibility of the City to meet and address all identified <br />shortcomings. <br />P hase 3, Task 8: City Responsibilities: <br />• City 's project manager assistance in scheduling GIS review meeting. (1 FTE hour) <br />• City's GIS stakeholder attendance/participation in meeting. (2 FTE hours each attendee). <br />Phase 3, Task 8: Timmons Group Responsibilities and Deliverables: <br />• Core System Technical Memo for GIS <br />Phase 3, Task 8: Assumptions: <br />• City will review and comment on all documentation within 10 business days or a mutually agreed upon <br />timeframe. <br />P hase 3, Task 8: Estimated Timeframe: <br />• GIS Review meeting and task deliverable are estimated to take 2-3 weeks to complete depending on City <br />availability <br />P hase 3, Task 9: Initial Cityworks AMS Configuration <br />The responsibility of this task is for Timmons Group to configure Cityworks based on the initial SD&C Plan <br />and deploy in the City's Test environment (within the City provided off -site Azure environment) for review <br />prior to Phase 4. The implementation team will take the information gathered and documented and <br />configure the Cityworks database. The initial configuration of Cityworks will be based on the Cityworks <br />Configuration Document and the Initial SD&C Plan developed in Phase 3. This initial configuration will <br />include the configuration for Cityworks Office, Respond and Mobile app. <br />18IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.