Laserfiche WebLink
software applications that the new system might need information from, or need to provide <br />information to (e g., financial, assessment, codes) and security requirements. <br />• Current Data Sets — Focus on data and best practices for Cityworks. Specifically, this would <br />include the work order, service request, and inspection documentation and data The Esri <br />geodatabase that will be mapped to Cityworks we expect limited if any, modification will be <br />necessary. <br />• Current Workflows — Define and model Work orders, Service Requests, Inspections, Interface <br />Communication, and migration of existing data leveraging Cityworks and our team's best <br />practices. <br />• Required Outputs — The required outputs of the current business process will be reviewed. <br />Outputs can take many forms, and may include reports, form letters, e-mails, export files, and <br />receipts. <br />® Required System Interfaces — The RFP identifies the need for the Cityworks system to <br />interface with Esri GIS, and optional various other systems. Our project team has reviewed the <br />provided information and has provided details of our proposed integrations within Task 8. <br />Following the configuration workshops, our implementation team will utilize the "as -is" workflows as <br />documented by LA Consulting for City of Everett and put forth the recommended, or "to -be" (future state), <br />workflows of the new Cityworks system. The recommended changes will strive to enhance the efficiency <br />of required tasks and follow industry best practices, as well as to enhance the satisfaction of the <br />citizens/businesses being served. The resulting Software Design and Configuration (SD&C) plan will be <br />the "floor plan" for the configuration of the Cityworks system. <br />Phase 4, Task 11 City Responsibility. <br />Review of draft SD&C (4 - 8 FTE Hours Per project team member) <br />SD&C Plan drafts <br />Phase 4 Task 11: Timmons Group Responsibilities and Deliverables: <br />Phase 4, Task 11: Assumptions: <br />will review all documentation within 10 bus ness days or a mutually agreed upon timeframe. <br />Phase 4, Task 11 Estimated Timeframe: <br />. The SDC plan will require approximately 8-12 weeks to complete <br />Phase 4, Task 12: Final Cityworks AMS Configuration <br />The responsibility of this task is to configure Cityworks based on the SD&C Plan and deploy in the City's <br />Test environment (within the City provided off -site Azure environment) for review prior to final <br />implementation. The implementation team will take the information gathered and documented and <br />configure the Cityworks database. The configuration of Cityworks will be based on the Cityworks <br />Configuration Document and the SD&C Plan developed from the onsite workshops. <br />Services for this task will include, but are not limited to: <br />® Work order or request types <br />® Work tasks for each work order type <br />• Employees and labor classifications in <br />that department <br />• Inventory (material) types <br />• Major equipment types <br />• Existing datasets used or slated to be <br />used in the work order or request <br />process <br />• Samples of service request and work <br />order printout forms <br />221Page <br />• System Administration <br />• Login, concepts, data model, viewing <br />grb Print Templates <br />• Creating and managing call center <br />activities <br />• Advanced aspects of call center <br />• Creating and managing problem <br />hierarchy <br />® General Configuration Issues <br />