My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/02 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:30:39 AM
Creation date
12/3/2020 2:48:45 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
implementation and identify issues and opportunities. The Testing and Acceptance Plan will frame and <br />guide the City through the testing process. <br />Phase 8Task 24B City Responsibility <br />City s Project Manager will work with staff to implement the Testing and Acceptance Plan <br />participant). <br />(8 FTE hours per <br />Phase 8, Task 24: Timmons Group Responsibilities and Deliverables <br />Testing Plan, results, • and remediation. Review test results <br />Phase 8, Task 24: Assumptions: <br />City will be prepared to work through the Testing and Acceptance Plan and complete within a thirty (30) day <br />period. <br />Phase 8, Task 24: ;Estimated T meframe:: <br />The configuration remediation will require approximately 6 8 weeks <br />P hase 8 Exit Criteria <br />® Testing and Acceptance Plan drafts and final. <br />® Addressing functional requirements not met/revealed by UAT that do meet defined functional <br />requirements <br />® Testing Plan, results, and remediation. Review test results <br />P hase 9: Training <br />P hase 9, Task 25: Onsite Training <br />During each onsite meeting (kickoff, workshops, configuration review, etc.) our implementation team will <br />consistently expose the City staff to Cityworks and basic workflows within the software. This incremental <br />training augments the training performed after final configuration. Our implementation team, in <br />conjunction with the City's Project Manager and key stake holders, will devise a training plan specific to <br />your environment and data. Training will include Cityworks Office Respond and Mobile app. As <br />necessary per workflows/roles. The approach to developing this plan is detailed below. <br />The training plan will include: <br />• Product training curriculum descriptions <br />• Listing of instructors <br />• Training Materials <br />• City responsibilities <br />• Schedule <br />This training plan will be used as a guide but may be modified when necessary to support the goals and <br />techniques of your staff resources. <br />Cityworks training is modular. Students attend those sections that are relevant to the type of work that <br />they are performing. All courses include relevant materials and sample data. The City will need to <br />identify who will be trained based upon the criteria and needs that will have been identified during the <br />Configuration Workshops. <br />Training will be developed for the following user types (along with the Casual User and Report training <br />identified earlier in the proposal): <br />• Routine User — Staff who will have the ability to update a request/work order after the crew has <br />completed their work <br />• Heavy User — Staff who will create work orders, schedule work orders, create PM's, maintain the <br />parts, create reports and generally will have the ability to use the whole system based on their <br />security level <br />• System Administrator — Staff who have full system access and be responsible for the daily <br />operations and maintenance of the Cityworks environment <br />34IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.