My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/02 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:30:39 AM
Creation date
12/3/2020 2:48:45 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
666
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Conduct 80 hours of End -user Training, classes, class duration, etc. to be per Training Plan <br />Phase 9, Task 25: Assumptions: <br />• City will provide a conference or training room appropriately sized for the number of participants. <br />• City will ensure attendance by identified staff. <br />• City staff attending training should have basic functional knowledge of computers and the windows operating <br />system. <br />• On -site training will be dependent on travel policies regarding Covid-19 restrictions set by City of Everett, <br />Timmons Group, and or States of Washington, Oregon, Virginia, Maryland and/or Louisiana depending on <br />resources required. <br />• If on -site training cannot occur, it will be replaced via virtual training <br />Phase 9, Task 25: Estimated Timeframe: <br />• Training will require approximately 2-3 weeks <br />P hase 9 Exit Criteria <br />• Training Plan and Training Documentation <br />• Conduct Administrator Training — 24 hours in duration <br />• Conduct 80 hours of End user Training, classes, class duration, etc. to be per Training Plan <br />P hase 10: Go -Live <br />P hase 10, Task 26: Final Product Configuration <br />Our implementation team will conduct the final product configuration based on the System Design and <br />Configuration Plan and Testing and results of the acceptance testing Our implementation team will <br />provide documentation for the key aspects of this project and Cityworks components. Proposed <br />documentation is summarized below: <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />Cityworks Configuration Document — Early on, our configuration team with City input, will <br />develop a Cityworks Configuration document that is maintained through the life of the project. <br />P roject Management Plan — Our Team will develop and maintain a project plan that includes <br />the scope of project services (and any changes), budget schedule, risk management and <br />communication approach. <br />Cityworks R Server Software — Azteca Systems, Inc. Provides standard documentation for the <br />latest product release. Separate documentation is provided for system administration and end <br />users. <br />S D&C Plan — Timmons Group will provide a copy of the plan resulting from the review, analysis <br />and documentation of the organization and its current workflows, data sets, IT system and <br />applications, system interface needs, output requirements, and public access and service <br />request needs. <br />System Integration and Data Conversion specific documentation. <br />Training Materials — Timmons Group will provide a copy of the training plan and all training <br />documents used during casual user, routine user, heavy user, ad -hoc reporting, management, <br />and system administrator training. <br />Testing and Acceptance Plan — Timmons Group will prepare and deliver a copy of the test <br />plan and test results report to be used for system certification and acceptance by the City. <br />Phase 10 Task 26: City Responsibility: <br />• Final review and acceptance of configuration (40 FTE hours) <br />Phase 10 Task 26: Timmons Group Responsibilities and Deliverables: <br />• All project documentation developed to date. <br />Phase 10, Task 26: Assumptions: <br />• City will receive all documentation in digital format. <br />Phase 10, Task 26• Estimated Timeframe: <br />• The final configuration of Cityworks per the SD&C Plan will require approximately 3-6 weeks <br />36IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.