My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All costs associated with abandoning existing storm drainage pipe as indicated on the <br /> plans including plugging and/or removal and disposal shall be included in the unit <br /> price for this bid item. <br /> Bid Item 18- Bore and Jack Installation, 36-Inch Diia, Casing, page SP-8, Replace with <br /> the following: <br /> Bid Item 18—Bore and Jack Installation,36-Inch Dia,Casing and 24-Inch Carrier <br /> Pipe <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price per linear foot of Bore-and-Jack Pipe Installation, 36-inch diameter steel <br /> casing, 0.500" wall thickness minimum (approximately 120 LF) and 24-inch diameter <br /> polypropylene sewer pipe (approximately 138 LF), shall be full compensation for all <br /> labor, materials, submittals, equipment, spacers, end seals, excavation of the <br /> jacking/receiving pits (including shoring and dewatering), bedding, backfill and <br /> compaction, traffic control, disposal of excess materials, surface restoration (including <br /> sawcutting, pavement removal and replacement),and survey information required in this <br /> specification. <br /> Add Bid Item 37—Type J Junction Box <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each for Type J Junction Box with non-slip surface(Drawing C16)shall <br /> be full compensation for all labor, materials, submittals, equipment, excavation, <br /> dewatering, bedding, backfill and compaction, traffic control, disposal of excess <br /> materials, surface restoration (including sawcutting, concrete removal and <br /> replacement). <br /> Add Bid Item 38—Pavement Marking <br /> Measurement and Payment: Lump Sum <br /> The lump sum price shall be full compensation for all labor, materials, submittals, <br /> equipment and traffic control necessary to perform restoration of all pavement markings <br /> disturbed by the construction. <br /> SPECIFICATIONS <br /> Add Section 8-20,2(9-29.2)Junction Boxes,Cable Vaults, and Pull Boxes, <br /> 8-20.2(9-29,2) Junction Boxes, Cable Vaults,and Pull Boxes <br /> Section 9-29.2 is supplemented with the following: <br /> All junction boxes shall conform to the details shown on the WSDOT Standard Plan J- <br /> 40 series, City of Everett Standard Drawing 808, and shall be of the type indicated in <br /> the plans. All junction box lids and frames shall be galvanized and those installed <br /> within sidewalk areas shall be slip-resistant. All junction boxes shall have base sections <br /> as shown in City of Everett Standard Drawings 808-809. All junction boxes to be <br /> located in the street or shoulder area shall be heavy duty junction boxes as detailed <br /> in WSDOT Standard Plan J-40.20 and described in Section 9-29.2(1)B. <br /> Addendum 2 Page 2 <br /> CITY OF EVERETf • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.