My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
il® <br /> CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> ADDENDUM NO, 3 <br /> TO <br /> JACKSON PARK STORMWATER SEPARATION AND TREATMENT <br /> W.O. # UP-3703 <br /> OCTOBER 7, 2020 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 3 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 3 in the space provided on page SP-18 in <br /> Division P, Proposal Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause its rejection. <br /> This Addendum consists of 7 pages, including all revisions, and attachments. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> Proposal, Page SP-16 and SP-17, Replace the previous Bid Schedule with the attached <br /> updated Bid Schedule. <br /> BID ITEM DESCRIPTIONS <br /> Bid item 17- PVC (formerly PE)Storm Drain Pipe, 24-Inch, page SP-8, Replace with the <br /> following: <br /> Bid Item 17-PE Storm Drain Pipe, 24-Inch (for Treatment site) <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price per linear foot bid for the type and size of storm drain pipe shall be full <br /> compensation for all labor, material, incidentals, tools and equipment necessary to <br /> complete the work as defined in these Contract Documents. <br /> The unit price per linear foot of storm drain pipe shall be full compensation for <br /> furnishing, hauling, and assembling in place the completed installation, including all <br /> wyes, tees, caps, plugs, special fittings,joint materials and adjustment of inverts and <br /> connections to inlets,catch basins and manholes for the completion of the installation <br /> to the required lines and grades. <br /> The unit price of storm drain pipe shall also include, but not be limited to; all costs for <br /> trench excavation; hauling and disposing of surplus material;dewatering;storm water <br /> flow bypassing; furnishing, stockpiling, hauling placing and compacting of suitable <br /> native backfill; cleaning and flushing pipes and existing structures; testing and <br /> inspecting pipe; pipe separation pads; connecting pipe to existing structures; <br /> reconnecting existing storm drains; and replacing, protecting, and maintaining <br /> utilities. <br /> Addendum 2 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.