My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> professional services shall provide evidence of Professional Liability insurance <br /> covering professional errors and omissions. Such policy shall provide the following <br /> minimum limits: <br /> $2,000,000 per Claim <br /> If the scope of such design-related professional services includes work related to <br /> pollution conditions, the Professional Liability insurance shall include Pollution <br /> Liability coverage. <br /> If insurance is on a claims made form, its retroactive date, and that of all subsequent <br /> renewals, shall be no later than the effective date of this Contract. <br /> 1-07.18(5)H Builder's Risk <br /> If the Project includes construction of a structure, the Contractor shall maintain <br /> property insurance under an "All Risk Builder's Risk" form in an amount equal to the <br /> value of the structure in a form acceptable to the City. The structure shall have All <br /> Risk Builder's Risk Insurance inclusive of earthquake and flood subject to <br /> customary industry deductibles. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, or <br /> processes. <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> Nothing contained in this Contract is intended to create any third-party beneficiary rights <br /> in favor of the public or any individual utilizing the facilities being constructed or improved <br /> under this Contract. <br /> 1-07.23(1) Construction Under Traffic <br /> Revise the third sentence of the second paragraph to read as follows: <br /> Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br /> may allow activating pedestrian recall timing or other accommodations during <br /> construction. <br /> Supplement 1-07.23(1) by adding the following: <br /> Because of significant traffic volumes on East Marine View Drive (EMVD), <br /> northbound lane closures will not be permitted. Southbound lane closures will be <br /> permitted with restrictions as defined by the City Traffic Engineer. Work at the <br /> intersection of EMVD and Summit Ave. will be restricted to days and hours as <br /> defined by the City Traffic Engineer. Work at the intersection of 19th St. and Summit <br /> Ave. will require approved traffic control plans to identify detours and parking, <br /> sidewalk and bike-lane closures. <br /> Should Contractor find these lane closures too restrictive, Contractor is directed to <br /> 1-08.0(2) HOURS OF WORK regarding weekend working hours. <br /> Maintain a minimum of one lane remaining open to traffic along Rockefeller Avenue <br /> at all times. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.