My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br /> situations as determined by the Engineer. The uniformed officer shall be paid under <br /> contract item "Traffic Control — Off-Duty Police Officer." <br /> Contractor shall notify the local Fire, Police and Engineering Departments before <br /> the beginning of each phase of construction so that these agencies may re-route <br /> their emergency vehicles around the construction zone. The non-emergency phone <br /> number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br /> Works Engineering is 257-8800. <br /> Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br /> Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br /> to enable rerouting of buses. <br /> Contractor shall notify the property owners at least 72 hours in advance to enable them <br /> to remove vehicles parked in the vicinity of Work. Towing vehicles shall be the <br /> responsibility of the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> (******) <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> All business driveways shall remain open except as necessary to permit curing <br /> of construction materials or for short periods of time as required for <br /> excavations. However, at least one driveway per business shall remain open <br /> to vehicular traffic at all times unless otherwise approved by the Engineer and <br /> affected property owner in writing. <br /> Signs and barricades shall be supplemented by lanterns or flasher units during <br /> the hours of darkness. <br /> Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> restrictions as provided for the drivers of private vehicles. <br /> Conduct the Work, at all-time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br /> Keep the streets, sidewalks and private driveways open except for the brief <br /> periods when actual Work is being done. <br /> No lane closures will be permitted between 3:30 p.m. and 6:00 p.m., unless <br /> specifically approved by the Engineer. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.