CITY OF EVERETT SPECIAL PROVISIONS <br /> from the Contractor and the Sureties such damages as it may sustain by reason of the <br /> Contractor's failure to comply with the terms of the Contract. Neither the acceptance by the <br /> Engineer nor any payment for the whole or any part of the Work, nor any extension of time, <br /> nor any possession taken by the City shall operate as a waiver of any portion of the Contract <br /> or of any power herein reserved or any right to damages herein provided, or bar recovery of <br /> any money wrongfully or erroneously paid to the Contractor. A waiver of any breach of the <br /> Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.0 Preliminary Matters <br /> 1-08.0(1) Preconstruction Conference <br /> Prior to the Contractor beginning the Work, a preconstruction conference will be held <br /> between the Contractor, the Engineer and such other interested parties as may be <br /> invited. The purpose of the preconstruction conference will be: <br /> 1. To review the initial progress schedule; <br /> 2. To establish a working understanding among the various parties associated or <br /> affected by the Work; <br /> 3. To establish and review, at a minimum, procedures for progress payment, <br /> notifications, approvals, and submittals; <br /> 4. To establish normal working hours for the Work; <br /> 5. To review safety standards and traffic control; and <br /> 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise required by 1-07.23(1) or otherwise <br /> noted and approved by the City within these Special Provisions, the normal straight time <br /> working hours for the Contract shall be any consecutive 8-hour period between 7:00 <br /> a.m. and 6:00 p.m. of a working day with a maximum 1-hour lunch break and a 5-day <br /> work week. Should Contractor elect to work on a holiday or weekend, those normal <br /> working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight time 8-hour <br /> working period for the Contract shall be established at the preconstruction conference <br /> or prior to the Contractor commencing the Work. <br /> When connecting to existing water mains and services are required, the City will obtain <br /> all necessary permissions and the normal hours of work shall be any consecutive 8-hour <br /> period between 6:00 p.m. and 7:00 a.m. Refer to 7-09.3(19)A regarding night or <br /> weekend connection work time requirements. <br /> If a Contractor is required to or desires to perform Work on holidays, weekends, or before <br /> 7:00 a.m. or after 10:00 p.m. on any weekday, the Contractor shall apply in writing to the <br /> Engineer for permission to work such times. Permission to work longer than an 8-hour <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—91 <br />