Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> period between 7:00 a.m. and 6:00 p.m. is not required. Such requests shall be <br /> submitted to the Engineer no later than noon on the working day prior to the day for <br /> which the Contractor is requesting permission to work, unless a noise variance will be <br /> required. In such case provide request a minimum of 30 days prior to performing the <br /> work in accordance with 1-07.1(1) NOISE. <br /> Permission to work Saturdays, Sundays, holidays or other than the agreed upon normal <br /> straight time working hours Monday through Friday may be given subject to certain other <br /> conditions set forth by the City or Engineer. These conditions may include, and not be <br /> limited to; requiring the Contractor to reimburse the City for the costs in excess of <br /> straight-time costs for City employees and necessary assistants who worked during such <br /> times, on non-Federal aid projects. Assistants may include, and are not be limited to, <br /> survey crews; personnel from the City's material testing lab; inspectors; and other City <br /> employees when in the opinion of the Engineer, such work necessitates their presence. <br /> The work performed on Saturdays, Sundays, and holidays will be considered as working <br /> days with regards to the Contract Time; and considering multiple work shifts as multiple <br /> working days with respect to Contract Time even though the multiple shifts occur in a <br /> single 24-hour period. <br /> 1-08.0(3) Reimbursement for Overtime Work of City Employees and <br /> Assistants <br /> Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br /> an 8-hour work shift on a regular working day, as defined in the Standard Specifications, <br /> such work shall be considered as overtime work. On all such overtime work an inspector <br /> will be present, and a survey crew may be required at the discretion of the Engineer. If <br /> such work is the result of Contractor's inability to complete work or coordinate materials, <br /> equipment and labor in accordance with agreed schedule, then the City may deduct from <br /> amounts due or to become due to the Contractor for the costs in excess of the straight- <br /> time costs for employees and assistants of the City required to work overtime hours. <br /> The Contractor by these specifications does hereby authorize the Engineer to deduct <br /> such costs from the amount due or to become due to the Contractor. <br /> 1-08.1 Subcontracting <br /> Delete the eighth paragraph in 1-08.1 and substitute the following: <br /> On all projects funded with City funds only, the Contractor shall certify to the actual <br /> amounts paid Disadvantaged, Minority, or Women's Business Enterprise firms that were <br /> used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br /> service providers on the Contract. This certification shall be submitted to the Engineer <br /> on WSDOT form 140-542 within 20 calendar days after physical completion of the <br /> Contract. <br /> Supplement 1-08.1 by adding the following: <br /> The Contract Documents shall apply to Subcontractors and suppliers as if each had <br /> signed the Contract with the City. Contractor shall include the provisions of these <br /> Contract Documents or a "flow down" clause in each contract with Subcontractors and <br /> suppliers. <br /> The City will not approve a Subcontractor that is also providing services to the City on <br /> the same project. <br /> No Subcontractor or lower tier subcontractor will be permitted to perform Work under the <br /> Contract until the following documents have been completed and submitted to the <br /> Engineer: <br /> 1. Request to Sublet Work (Form 421-012), and <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—92 <br />