My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Engineer will give the Contractor written notice of the Physical Completion Date <br /> for all Work the Contract requires. That date shall constitute the Physical <br /> Completion Date of the Contract but shall not imply the City's acceptance of the <br /> Work or the Contract. <br /> The Engineer will give the Contractor written notice of the Completion Date of the <br /> Contract after all the Contractor's obligations under the Contract have been <br /> performed by the Contractor. The following events must occur before the <br /> Completion Date can be established: <br /> 1. The physical Work on the project must be complete; and <br /> 2. The Contractor shall furnish all documentation required by the Contract <br /> and required by law, to allow the City to process final acceptance of the <br /> Contract. <br /> The following documents must be received by the Engineer prior to establishing a <br /> Completion Date: <br /> a. Certified payrolls. <br /> b. Material Acceptance Certification Documents. <br /> c. Annual Report of Amounts Paid as MBE/WBE Participants. <br /> d. Final Contractor Voucher Certification. <br /> e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> and all Subcontractors. <br /> Supplement 1-08.5 by adding the following: <br /> 1-08.5(2) Substantial Completion <br /> When the Contractor considers the Work to be Substantially Complete and ready for its <br /> intended use, it shall give Notice to the City's Representative. The Notice shall include <br /> an itemized list of remaining incomplete Work. If the City's Representative determines <br /> the Work is not substantially complete, it will so notify the Contractor in writing, identifying <br /> the reasons for such a determination. If the City's Representative finds the Work <br /> substantially complete, it will meet with the Contractor to (1) prepare a Punch List of <br /> incomplete items of Work; (2) define the division of responsibility between City and <br /> Contractor with respect to security, operation, maintenance, heat, utilities, insurance, <br /> and warranties; and (3) describe other issues related to acceptance of the substantially <br /> completed Work. <br /> If the City's Representative is not an employee of the City, the City's Representative will <br /> write to the City upon reaching agreement with the Contractor, certifying that the Work <br /> is substantially complete, listing the items of incomplete Work, stating the date for <br /> completion of incomplete work, defining the division of responsibilities, and setting forth <br /> any other terms related to acceptance. In such event, the City will review the City's <br /> Representative's certification that the Work is substantially complete. If the City concurs, <br /> the City will notify the Contractor in writing that the Work is accepted as substantially <br /> complete. Except for any portion(s) of Work specified for early completion or required <br /> by the City for early possession, Substantial Completion will not occur for Work until the <br /> entire Project is ready for possession and use. The acceptance Notice will include a <br /> Punch List of incomplete Work items and corrective Works, set the date for their <br /> completion and repair, describes the division of responsibility between the City and <br /> Contractor, and describe other terms of acceptance. The Contractor will acknowledge <br /> receipt of the acceptance Notice in writing, indicating acceptance of all of its terms and <br /> provisions. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.