My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> • <br /> Parking spaces are limited in most areas of the project and the Contractor will be <br /> required to cooperate with the City in resolving parking issues. In general, businesses <br /> and residents who rely on on-street parking and are displaced by the construction shall <br /> be given priority for the nearest available parking location. The Contractor's employees <br /> may be required to park their personal vehicles away from the area of construction. <br /> 1-08.5 Time for Completion <br /> Delete all of 1-08.5 and substitute the following: <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of <br /> "working days" stated in the Contract Provisions or as extended by the Engineer in <br /> accordance with Section 1-08.8. Every day will be counted as a "working day" <br /> unless it is a nonworking day or an Engineer determined unworkable day. A <br /> nonworking day is defined as a Saturday, a Sunday, a whole or half day on which <br /> the Contract specifically prohibits Work on the critical path of the Contractor's <br /> approved progress schedule, or one of these holidays: January 1, the third Monday <br /> of January, the third Monday of February, Memorial Day, July 4, Labor Day, <br /> November 11, Thanksgiving Day, the day after Thanksgiving, and Christmas Day. <br /> When any of these holidays fall on a Sunday, the following Monday shall be counted <br /> a nonworking day. When the holiday falls on a Saturday, the preceding Friday shall <br /> be counted a nonworking day. The days between December 25 and January 1 will <br /> be classified as nonworking days. <br /> An unworkable day is defined as a half or whole day the Engineer declares to be <br /> unworkable because of weather or conditions caused by the weather that prevents <br /> satisfactory and timely performance of the Work shown on the critical path of the <br /> Contractor's approved progress schedule. Other conditions beyond the control of <br /> the Contractor may qualify for an extension of time in accordance with Section 1- <br /> 08.8. <br /> Contract Time shall begin on the effective date of the Notice to Proceed. The <br /> Contract Documents may specify another starting date for Contract Time, in which <br /> case, Contract Time will begin on the starting date the Contract Documents specify. <br /> Each working day shall be charged to the Contract as it occurs, beginning on the <br /> effective date of the Notice to Proceed, unless otherwise provided in the Contract <br /> Documents, until the Contract Work is physically complete. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of working <br /> days: (1) charged to the Contract the week before; (2) specified for the physical <br /> completion of the Contract; and (3) remaining for the physical completion of the <br /> Contract. The statement will also show the nonworking days and partial or whole <br /> day the Engineer declares as unworkable. Within 14 calendar days after the date <br /> of each statement, the Contractor shall file a written protest of any alleged <br /> discrepancies in it. To be considered by the Engineer, the protest shall be in <br /> sufficient detail to enable the Engineer to ascertain the basis and amount of time <br /> disputed. By not filing such detailed protest in that period, the Contractor shall be <br /> deemed as having accepted the statement as correct. If the Contractor elects to <br /> work ten hours a day and four days a week (a 4-10 schedule) and the fifth day of <br /> the week in which a 4-10 shift is worked would ordinarily be charged as a working <br /> day then the fifth day of that week will be charged as a working day whether or not <br /> the Contractor works on that day. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.