My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-09.11A(3)D1 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for <br /> Delays to the extent caused by a Third Party or a Force Majeure Event. <br /> Extension of Contract Time shall be determined pursuant to 1-08.8 <br /> EXTENSIONS OF TIME. <br /> 1-09.11A(4) Extended or Unabsorbed Overhead <br /> 1-09.11A(4)A General <br /> To present a request for additional compensation for Extended or Unabsorbed <br /> Overhead, the Contractor has the burden of keeping and maintaining accurate <br /> documentation to support any such claim. If the Contractor fails to provide or keep <br /> inadequate financial data for an accurate and fair Eichleay calculation, Contractor <br /> waives and releases any claim for Unabsorbed or Extended Overhead. In <br /> presenting any claim under this section of the Contract, the Contractor agrees to <br /> provide to the City any and all financial data needed by the City, or its <br /> representative, to review, substantiate and evaluate any claim for Extended or <br /> Unabsorbed Home Office Overhead, or both. Failure to provide the requested <br /> information shall constitute waiver by the Contractor. <br /> If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or <br /> Extended Overhead, it shall be calculated as provided in these Special Provisions. <br /> 1-09.11A(4)A1 Elements <br /> Contractor shall only be entitled to an adjustment of Contract Sum for <br /> Unabsorbed or Extended Overhead if it clearly and convincingly demonstrates <br /> all of the following: <br /> 1. The City solely caused a Delay to the Completion Date as measured <br /> by analysis of the project duration by the critical path method <br /> pursuant to 1-08.3 PROGRESS SCHEDULE; <br /> 2. Because of the Delay described in subsection (1), the Contractor <br /> was forced to suspend or significantly interrupt its performance so <br /> that it was on standby or idled, and the City required the Contractor <br /> to be ready to resume performance on short notice. Extended time <br /> of performance of Work, such as extensions caused by changes, <br /> inefficiencies, or extra Work, does not constitute suspension or <br /> significant interruption of performance. <br /> 3. The Contractor could not and did not use resources, including, but <br /> not limited to, labor, equipment, materials and tools, standing by or <br /> idled on this or other project for any Work during the period of Delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its <br /> usual seasonal Overhead costs during the period of Delay; and <br /> 5. The Delay did not cause over absorbed Overhead in the period the <br /> delayed Work was completed. <br /> 1-09.11 A(4)A1 a Resources <br /> To demonstrate the Contractor could not and did not use resources, <br /> including, but not limited to, labor, equipment, materials and tools from <br /> this Project for any other work on this or any other project during the <br /> period of Delay in accordance with item 3 of 1-09.11A(4)A1 of these <br /> Special Provisions, the Contractor shall: <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-123 <br />